Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BETA INDUSTRIES, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BETA INDUSTRIES, INC. in 2860 CULVER AVE., DAYTON, OH 45429 (NAICS 332997). OSHA activity number 331114157.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Beta Industries, INC. — free Get an email when a new federal OSHA severe-injury report for Beta Industries, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2860 CULVER AVE.
City
DAYTON
State
OH
ZIP
45429
Mailing
2860 CULVER AVE., DAYTON, OH 45429
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332997
Employees
29
Ownership type
A

7 citations on file for this inspection.

1910.147 C04 II

Serious Gravity 10 8 instances 5 exposed
Issued
May 11, 2012
Abate by
Jun 4, 2012
Penalty
Initial $4,900 · Current $2,450 Reduced
29 CFR 1910.147(c)(4)(ii):  The procedures shall clearly and specifically outline the scope, purpose, authorization, rules,and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:    (a)  The machine specific energy isolating procedures were inadequate for the CNC machines, in that they did not include a specific statement on the intended use of the procedures, specific procedural steps for shutting down, isolating, blocking, securing equipment and for the removal and transfer of lockout devices and the responsibility for them, as well as specific requirements for testing machines to verify the effectiveness of lockout devices.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $2450
  • — Z (S) $4900

1910.147 C05 I

Serious Gravity 5 8 instances 5 exposed
Issued
May 11, 2012
Abate by
Jun 4, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(5)(i):  Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardwareshall be provided by the employer for isolating, securing or blocking of machines or equipment from energy sources:      (b)  Employees were not provided with locks or tags to attach to the energy isolating devices, prior to changing the blades on the horizontal and vertical band saws.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C06 I

Serious Gravity 5 8 instances 5 exposed
Issued
May 11, 2012
Abate by
Jun 4, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at leastannually to ensure that the procedure and the requirements of this standard are being followed:    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C07 I

Serious Gravity 5 8 instances 5 exposed
Issued
May 11, 2012
Abate by
Jun 4, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(i):  The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees:  (b)  Employee training on the energy control program was inadequate, in that it did not include training employees on how and when to lock out the saws, prior to doing blade changes.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 D03

Serious Gravity 5 8 instances 5 exposed
Issued
May 11, 2012
Abate by
Jun 4, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(d)(3):  Machine or equipment isolation. All energy isolating devices that are needed to control the energyto the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energysource(s):  (b)  Employees changed the blades on the horizontal and vertical band saws without first isolating the energy sources.        In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 D04 I

Serious Gravity 5 8 instances 5 exposed
Issued
May 11, 2012
Abate by
Jun 4, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(d)(4)(i):  Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees:  (b)  Employees changed the blades on the horizontal and vertical band saws without first affixing a lockout device to the energy isolating devices.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 10 6 instances 5 exposed
Issued
May 11, 2012
Abate by
Aug 30, 2012
Penalty
Initial $4,900 · Current $2,450 Reduced
29 CFR 1910.212(a)(1):  Types of guarding. One or more methods of machine guarding shall be provided to protect the operatorand other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips andsparks. Examples of guarding methods are-barrier guards, two-hand tripping devices,electronic safety devices, etc.:    (a)  The guards on the CNC mills, including the Fadal #1 VMC-40 Vertical Machining (Milling) Center, were not interlocked with the machine control system.     (b)  The guards on the Okuma MC-4VA CNC Mill were not interlocked with the machine control system, and the guards did not enclose the machine, thereby exposing the operators head and shoulders to potential injuries should the parts or tooling shatter and/or fly out.         In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $2450
  • — Z (S) $4900

View Beta Industries, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331114157.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.