OSHA Inspection: FRANK CISCO DBA GTO CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FRANK CISCO DBA GTO CONSTRUCTION in 8247 W. GOLF ROAD, NILES, IL 60714 (NAICS 238350). OSHA activity number 331899047.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Frank Cisco DBA GTO Construction — free Get an email when a new federal OSHA severe-injury report for Frank Cisco DBA GTO Construction is published. One employer, no account, unsubscribe in one click.
Site address
8247 W. GOLF ROAD
City
NILES
State
IL
ZIP
60714
Mailing
1800 W. PERSHING, CHICAGO, IL 60629
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238350
Employees
3
Ownership type
A

5 citations on file for this inspection.

1903.19 C01

Other-than-serious 3 exposed
Issued
Apr 9, 2012
Abate by
May 21, 2012
Penalty
Initial $600 · Current $600
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:    Frank Cisco dba GTO Construction failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:    Citation Number 		Item Number			Abatement Date  01			01				1/25/2012  01			02				1/25/2012  01			03				1/25/2012  01			04				1/25/2012    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $600

1926.451 B01

Serious Gravity 10 2 instances 3 exposed
Issued
Jan 24, 2012
Abate by
Jan 25, 2012
Penalty
Initial $4,200 · Current $4,200
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):    a) Employees were exposed to the hazard of falling approximately 17 feet while working from scaffolding that was not fully planked.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4200

1926.451 E01

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 24, 2012
Abate by
Jan 25, 2012
Penalty
Initial $3,000 · Current $3,000
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used:    a) Employees were not provided with safe access to the scaffolding work level from which they were required to work at an elevation of approximately 17 feet.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $3000

1926.451 F03

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 24, 2012
Abate by
Jan 25, 2012
Penalty
Initial $3,000 · Current $3,000
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    a) The employer did not have a competent person inspect scaffolding and scaffolding components before the work shift at the site.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $3000

1926.451 G01

Serious Gravity 10 2 instances 3 exposed
Issued
Jan 24, 2012
Abate by
Jan 25, 2012
Penalty
Initial $4,200 · Current $4,200
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level:    a) Employees were exposed to the hazard of falling approximately 17 feet while working from scaffolding without fall protection.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331899047.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.