Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: RIGHT DONE CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RIGHT DONE CORPORATION in 100 SHERIDAN RD., HIGHLAND PARK, IL 60035 (NAICS 238350). OSHA activity number 331901272.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Right Done Corporation for free Get an email when a new federal OSHA severe-injury report for Right Done Corporation is published. One employer, no account, unsubscribe in one click.
Site address
100 SHERIDAN RD.
City
HIGHLAND PARK
State
IL
ZIP
60035
Mailing
830 E. OLD WILLOW RD., PROSPECT HEIGHTS, IL 60070
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238350
Employees
2
Ownership type
A

5 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 9, 2012
Abate by
Feb 10, 2012
Penalty
Initial $4,200 · Current $1,780 Reduced
29 CFR 1926.451(b)(1):  Each platform on all working levels was not fully planked or decked between front uprights and the guardrail supports:      a)  Employees were exposed to fall hazards of approximately 16.5 feet while working on scaffold platforms which were not fully decked.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $1780
  • · Z (S) $4200

1926.451 G01

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 9, 2012
Abate by
Feb 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1):  Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:    a)  Employees working from frame scaffolding were exposed to fall hazards of approximately 16.5 feet.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.501 B13

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 9, 2012
Penalty
Initial $4,200 · Current $1,680 Reduced
29 CFR 1926.501(b)(13):  Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems, nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502:    a)  Employees performing carpentry work were exposed to fall hazards of approximately 19 feet.    No abatement certification or documentation is required for this item.
Recent events (2)
  • · I (S) $1680
  • · Z (S) $4200

1926.1053 B04

Serious Gravity 5 1 exposed
Issued
Feb 9, 2012
Abate by
Feb 10, 2012
Penalty
Initial $2,400 · Current $1,040 Reduced
29 CFR 1926.1053(b)(4):  Ladder(s) were used for purposes other than the purpose for which they were designed:    a)  Employees were exposed to fall hazards while using an a-frame ladder which was not unfolded.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1040
  • · Z (S) $2400

1926.405 G01 III

Other-than-serious 1 exposed
Issued
Feb 9, 2012
Abate by
Feb 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.405(g)(1)(iii):  Flexible cords and cables were:  (A) Used as a substitute for the fixed wiring of a structure; (B) Run though holes in walls, ceilings, or floors; (C) Run through doorways, windows, or similar openings; (D) Attached to building surfaces; or (E) Concealed behind building walls, ceilings, or floors:    a)  Flexible cords and cables were run though windows.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331901272.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.