Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: DEPARTMENT OF THE NAVY, US MARINE CORPS, FLEET SUPPORT DIVISION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DEPARTMENT OF THE NAVY, US MARINE CORPS, FLEET SUPPORT DIVISION in BOX 110870, BLDG 406 FLEET SUPPORT DIVISION, BARSTOW, CA 92311 (NAICS 928110). OSHA activity number 331901835.

Watch Department OF THE Navy, US Marine Corps, Fleet Support Division — free Get an email when a new federal OSHA severe-injury report for Department OF THE Navy, US Marine Corps, Fleet Support Division is published. One employer, no account, unsubscribe in one click.
Site address
BOX 110870, BLDG 406 FLEET SUPPORT DIVISION
City
BARSTOW
State
CA
ZIP
92311
Mailing
BOX 110870, BLDG 406 FLEET SUPPORT DIVISION, BARSTOW, CA 92311
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
928110
Employees
60
Ownership type
D

7 citations on file for this inspection.

1910.37 B05

Serious Gravity 1 1 instance 30 exposed
Issued
May 24, 2012
Abate by
May 30, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.37(b)(5):  Each doorway or passage along an exit access that could be mistaken for an exit was not marked "Not an Exit" or similar designation, or be identified by a sign indicating its actual use.      (a) At FSD Bldg 561 Tool Room, the door that leads to the storage closet was not labeled "NOT AN EXIT".
Recent events (1)
  • — Z (S) $0

1910.303 B01 II

Serious Gravity 5 2 instances 8 exposed
Issued
May 24, 2012
Abate by
May 30, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(1)(ii):  Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided.      (a) At FSD Bldg 402, East end, wood shop power panel A, circuit breaker #19 was taped and breakers #12 and 14 were tied together.
Recent events (1)
  • — Z (S) $0

1910.303 B02

Serious Gravity 5 5 instances 15 exposed
Issued
May 24, 2012
Abate by
May 30, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(2):   Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling.      (a) At the Air Clearance Authority room, a relocatable power tap (RPT) was used to plug-in 2 Mr coffee, coffee maker and a refrigerator.      (b) At the Assistant Transportation office, 2 relocatable power taps were daisy chained, one RPT was connected to the other.      (c) At the Supply Clerk's room, a relocatable power tap was used to plug-in a microwave oven, oscillating fan, Keurig coffee pot and a printer.      (d) At the QC/QA break room, a relocatable power tap was used to plug-in a Hamilton Beach Coffee maker and a toaster oven.      (e) At employee break room of Bldg 560, 2 relocatable power taps were daisy chained, one RPT was connected to the other.
Recent events (1)
  • — Z (S) $0

1910.303 B07

Serious Gravity 5 1 instance 20 exposed
Issued
May 24, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(7):  Electric equipment was not installed in a neat and workmanlike manner.      (a) At FSD, the electrical power panel 6-C, had a loose conduit, only the energized conductors were preventing the conduit from dangling.
Recent events (1)
  • — Z (S) $0

1910.303 F02

Serious Gravity 5 2 instances 10 exposed
Issued
May 24, 2012
Abate by
May 30, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.303(f)(2):  Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident.      (a) At the QC/QA break room, circuit breaker power panel was not marked or labeled.      (b) At Bldg 402 East end, wood shop power panel A, not all circuit breakers were labeled or marked.
Recent events (1)
  • — Z (S) $0

1910.304 F01 IV

Serious Gravity 1 1 instance 4 exposed
Issued
May 24, 2012
Abate by
May 30, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.304(f)(1)(iv):  Overcurrent devices for circuits rated 600 volts, nominal, or less, were not readily accessible to each employee or authorized building management personnel.      (a) At FSD, QC, QA break room, the circuit breaker panel was obstructed by boxes of materials and metal file cabinets.
Recent events (1)
  • — Z (S) $0

1910.305 G02 III

Serious Gravity 5 2 instances 8 exposed
Issued
May 24, 2012
Abate by
Jun 5, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(2)(iii):  Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws.      (a) At Bldg 402, the swamp cooler power cord and power cord in the scale area, did not have strain relief, insulation was separated from the plug.
Recent events (1)
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331901835.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.