CINCINNATI, OH —
OSHA Inspection: MESSER CONSTRUCTION CO.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of MESSER CONSTRUCTION CO. in 401 EAST COURT ST., CINCINNATI, OH 45202 (NAICS 236220). OSHA activity number 331910034.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MESSER CONSTRUCTION CO.
- Site address
- 401 EAST COURT ST.
- City
- CINCINNATI
- State
- OH
- ZIP
- 45202
- Mailing
- 5158 FISHWICK DR., CINCINNATI, OH 45202
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 15
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.20 B01
- Issued
- Apr 5, 2012
- Abate by
- Apr 30, 2012
- Penalty
- Initial $6,300 · Current $6,300
General-duty citation text
29 CFR 1926.20(b)(1): The employer did not initiate and maintain such programs as may be necessary to comply with this part (29 CFR 1926): a) On and before January 27, 2012, where construction-phased sequencing varied from prescribed structure erection design specified control methods the employer had not established safety and health programs which addressed construction activity inspection and a correction-coordination assurance program and procedures to ensure project-sequenced steel erection beam to column double connection point at end phases were in place at various locations of the casino and banquet deck levels with an adequate support system or devices to ensure (concrete slab form diaphragm) metal decking walking and working surfaces strength and structural integrity was being maintained prior to concrete being loaded onto it and to ensure adequate support devices or system installation for continued structural steel assembly erection from the end-phased double connection points. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
- — I (S) $6300
- — Z (S) $6300
1926.20 B02
- Issued
- Apr 5, 2012
- Abate by
- Apr 10, 2012
- Penalty
- Initial $6,300 · Current $0 Reduced
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment to be made by a competent person: a) On and before January 27, 2012, the employer did not initiate and maintain a program for the frequent and regular inspection of the job site, materials and equipment at various locations of the casino and banquet deck levels to ensure that the (concrete slab form diaphragm) metal decking walking and working surfaces strength and structural integrity was being maintained and supported by various sequenced steel erection beam-to-column double connection point at end phases with an adequate number of bolts, welds, or other equivalent support systems / devices and with correction verification prior to concrete being loaded onto those surfaces as well as an inspection program to ensure adequate support device / system installation for continued structural steel assembly erection beyond the end-phased double connection points. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
- — I (S) $0
- — Z (S) $6300
1926.501 A02
- Issued
- Apr 5, 2012
- Penalty
- Initial $6,300 · Current $0 Reduced
General-duty citation text
29 CFR 1926.501(a)(2): The employer did not determine if the walking/working surfaces on which its employees were to work had the strength and structural integrity to support employees safely: On and before January 27, 2012, the contractor failed to determine and ensure that the strength and structural integrity of the (concrete slab form diaphragm) metal decking walking and working surfaces at the casino deck and banquet levels were being maintained during various sequenced steel erection beam-to-column double connection point-at-end phases with an adequate number of bolts, welds, or other equivalent support at those double connection points to protect employees working on or within the structure and exposing employees to the hazard potential associated with crushing injuries from a structural collapse and fall potentials of 25 feet.
Recent events (2)
- — I (S) $0
- — Z (S) $6300
1926.754 A
- Issued
- Apr 5, 2012
- Abate by
- Apr 30, 2012
- Penalty
- Initial $6,300 · Current $6,300
General-duty citation text
29 CFR 1926.754(a): Structural stability shall be maintained at all times during the erection process. On and before January 27, 2012, the contractor failed to ensure structural stability was being maintained on the casino and banquet deck levels at various sequenced construction steel erection beam-to-column double connection point-at-end phases. Due to an inadequate number of bolts, welds, or other equivalent support at those double connection points as a part of the structural steel assembly, a combination of loads on the structure during a concrete pour atop the metal decking exceeded the capability of the structure to resist, distribute and transfer the imposed loads and created an overload condition for the structural steel assembly at the end-phased double connection points supporting the structure which resulted in failure of the connection points and potential inadequate support for continued structursteel assembly erection from end phased double connection points exposing workers to crushing injuries and a fall potential of 25 feet..
Recent events (2)
- — I (S) $6300
- — Z (S) $6300
More inspections at Messer Construction CO.
View Messer Construction CO.'s full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331910034.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.