PEARL HARBOR, HI ·
OSHA Inspection: NCM CONTRACTING GROUP, LP
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of NCM CONTRACTING GROUP, LP in NOAA PRC MAIN FACILITY, FORD ISLAND, PEARL HARBOR, HI 96860 (NAICS 236210). OSHA activity number 331920157.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NCM CONTRACTING GROUP, LP
- Site address
- NOAA PRC MAIN FACILITY, FORD ISLAND
- City
- PEARL HARBOR
- State
- HI
- ZIP
- 96860
- Mailing
- 94532 PUAHI STREET, UNIT A, WAIPAHU, HI 96797
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236210
- Employees
- 5
- Ownership type
- Private (A)
Citations
4 citations on file for this inspection.
1926.600 A03 I
- Issued
- Jun 8, 2012
- Penalty
- Initial $2,380 · Current $2,380
General-duty citation text
29 CFR 1926.600(a)(3)(i): Bulldozer and scraper blades, end-loader buckets, dump bodies, or similar equipment were not fully lowered or blocked when being repaired or when not in use: (a) NOAA PRC Construction Site: South side of Building 175: On or about 14 FEB 12, power industrial truck (JLG Lift, 660SJ) load engaging means was left suspended in the air and not fully lowered when it was not in use exposed employees to a crushing hazards.
Recent events (2)
- · I (O) $2380
- · Z (S) $2380
1926.62 D07
- Issued
- Jun 8, 2012
- Abate by
- Jun 15, 2012
- Penalty
- Initial $1,785 · Current $0 Reduced
General-duty citation text
29 CFR 1926.62(d)(7): Additional exposure monitoring was not conducted when there had been a change of equipment, process, control, personnel, or a new task initiated that may have resulted in employees already exposed at or above the action level being exposed above the permissible exposure limit: (a) NOAA PRC Construction Site, Lead abatement Building 175 and 176: On or about 14 FEB 12, employee monitoring result of 24 JAN 2012 showed personal exposure above the lead permissible exposure limit (PEL) of 50 mg cubic meter. New personnel continue the paint removal work without air monitoring conducted to determine new employees lead exposure.
Recent events (2)
- · I (S) $0
- · Z (S) $1785
1926.62 D08 I
- Issued
- Jun 8, 2012
- Abate by
- Jun 15, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.62(d)(8)(i): The employer must, as soon as possible but no later than 5 working days after the receipt of the results of any monitoring performed under this section, notify each affected employee of these results either individually in writing or by posting the results in an appropriate location that is accessible to employees. (a) NOAA PRC Construction Site, Lead abatement Building 175 and 176: On or about 14 FEB 12, employees monitoring results on 29 DEC 2010 and 24 JAN 2012 showed personal exposure above the lead permissible exposure limit of 50 mg cubic meter. Employees were not notified of their exposure in writing.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.62 D08 II
- Issued
- Jun 8, 2012
- Abate by
- Jun 15, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.62(d)(8)(ii): Whenever the results indicate that the representative employee exposure, without regard torespirators, is at or above the PEL the employer shall include in the written notice a statement that the employees exposure was at or above that level and a description of the corrective action taken or to be taken to reduce exposure to below that level. (a) On or about 14 FEB 12, employees monitoring results on 29 DEC 2010 and 24 JAN 2012 showed personal exposure above the lead permissible exposure limit of 50 mg cubic meter were not notified in writing of the corrective action to reduce exposure to below that level. A corrective action statement was put out on 4 JAN 2011 but the statement only addressed bulk samples and requirements for disposal of lead-containing items and nothing about reducing lead exposure to below the PEL.
Recent events (2)
- · I (S) $0
- · Z (S) $0
More inspections at NCM Contracting Group, LP
View NCM Contracting Group, LP's full OSHA safety record →
More inspections in this industry (NAICS 236210)
More inspections in HI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 331920157.