Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,194,531Inspections Most recent open 2026-08-11 Last loaded 2026-08-14

OSHA Inspection: U.S. COTTON LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of U.S. COTTON LLC in 15501 INDUSTRIAL PARKWAY, CLEVELAND, OH 44135 (NAICS 339113). OSHA activity number 332801448.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch U.S. Cotton LLC for free Get an email when a new federal OSHA severe-injury report for U.S. Cotton LLC is published. One employer, no account, unsubscribe in one click.
Establishment
U.S. COTTON LLC
Site address
15501 INDUSTRIAL PARKWAY
City
CLEVELAND
State
OH
ZIP
44135
Mailing
15501 INDUSTRIAL PARKWAY, CLEVELAND, OH 44135
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
339113
Employees
789
Ownership type
Private (A)

6 citations on file for this inspection.

1910.212 A01

Serious Gravity 10 4 instances 1 exposed
Issued
Aug 6, 2012
Abate by
Aug 24, 2012
Penalty
Initial $7,000 · Current $2,333 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips:    On or before 2/9/12, the back side of the four Baler and Compaction Equipment(BACE) vertical cardboard balers, located in the Branded Plant, were not adequately guarded, thereby exposing employees to crushing and amputation hazards             U.S. COTTON, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD OR ITS EQUIVALENT STANDARD, 29 CFR1910.212 (a) (1), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 315200428, CITATION NUMBER 1, ITEM NUMBER 02, AND WAS AFFRIMED AS A FINAL ORDER ON 06/30/2011, WITH RESPECT TO THE WORKPLACE LOCATED AT 15501 INDUSTRIAL PARKWAY, CLEVELAND, OH 44135
Recent events (3)
  • · F (S) $2333
  • · C (S) $7000
  • · Z (S) $7000

1910.262 D03

Serious Gravity 10 6 instances 1 exposed
Issued
Aug 6, 2012
Abate by
Aug 24, 2012
Penalty
Initial $7,000 · Current $0 Reduced
29 CFR 1910.262(d)(3): Nip point(s) of the feed roll(s) on opening and picking machinery were not covered with a guard designed to prevent the operator from reaching the nip while machinery was in operation:       The feed rolls on the six (6) square comber machines, located in the Square Department, were not guarded .
Recent events (3)
  • · F (S) $0
  • · C (S) $7000
  • · Z (S) $7000

1910.219 F01

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 6, 2012
Abate by
Aug 24, 2012
Penalty
Initial $5,500 · Current $2,333 Reduced
29 CFR 1910.219(f)(1):  Gear(s) were not guarded by a complete enclosure or by one of the methods specified in 29 CFR 1910.219(f)(1)(ii) and (f)(1)(iii):        The gear of the square machine/comber unit, located in the Square Department, was not adequately guarded.
Recent events (3)
  • · F (S) $2333
  • · C (S) $5500
  • · Z (S) $5500

1910.262 C05

Deleted Serious Gravity 5 1 instance 4 exposed
Issued
Aug 6, 2012
Abate by
Sep 18, 2012
Penalty
Initial $6,600 · Current $0 Reduced
29 CFR 1910.262(c)(5): An inspection program was not implemented to ensure all guards and safety devices, including starting and stopping devices were properly maintained:     On and before 02/09/2012 the employer failed to develop or implement an inspection process to ensure that guards and other safety devices were properly maintained.  Equipment includes, but not limited to: six (6) sliver and lapper machine units, and a comber unit, located in the Square department .
Recent events (3)
  • · F (S) $0
  • · C (S) $6600
  • · Z (S) $6600

1910.212 A01

Repeat Gravity 10 54 instances 4 exposed
Issued
Aug 6, 2012
Penalty
Initial $70,000 · Current $70,000
29 CFR 1910.212(a)(1):  One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks.           On or before 02/09/2012 the 1800 RPM transfer wheel ingoing nip point on the 54 swab machines, located in the Private Label Plant, were not guarded.       U.S. COTTON, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD OR ITS EQUIVALENT STANDARD, 29 CFR1910.212 (a) (1), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 315200428, CITATION NUMBER 1, ITEM NUMBER 02 AND 29 CFR 1910.219(f)(1) CITATION NUMBER 1 , ITEM NUMBER 04, AND WAS AFFRIMED AS A FINAL ORDER ON 06/30/2011, WITH RESPECT TO THE WORKPLACE LOCATED AT 15501 INDUSTRIAL PARKWAY, CLEVELAND, OH 44135.
Recent events (3)
  • · F (R) $70000
  • · C (W) $70000
  • · Z (W) $70000

1910.212 A03 II

Serious Gravity 10 24 instances 2 exposed
Issued
Aug 6, 2012
Abate by
Aug 24, 2012
Penalty
Initial $38,500 · Current $2,334 Reduced
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle:      On and before 02/09/2012,  the point of operation guards installed on the following machinery, located in the Stick Plant, did not prevent the operator from having any part of their body in the danger zone during the operating cycle:    a. The box leveler area on the twelve (12) auto pack machines;     b. The funnel area on the twelve(12) auto pack machines;             U.S. COTTON, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD OR ITS EQUIVALENT STANDARD, 29 CFR1910.212 (a) (1), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 315200428, CITATION NUMBER 1, ITEM NUMBER 02, AND WAS AFFRIMED AS A FINAL ORDER ON 06/30/2011, WITH RESPECT TO A WORKPLACE LOCATED AT 15501 INDUSTRIAL PARKWAY, CLEVELAND, OH 44135.
Recent events (3)
  • · F (S) $2334
  • · C (R) $38500
  • · Z (R) $38500

View U.S. Cotton LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 332801448.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.