Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,892Inspections Most recent open 2026-09-03 Last loaded 2026-09-07

OSHA Inspection: SUN-FAB

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SUN-FAB in 6501 TROWBRIDGE, EL PASO, TX 79905 (NAICS 237120). OSHA activity number 332835081.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Sun-Fab for free Get an email when a new federal OSHA severe-injury report for Sun-Fab is published. One employer, no account, unsubscribe in one click.
Establishment
SUN-FAB
Site address
6501 TROWBRIDGE
City
EL PASO
State
TX
ZIP
79905
Mailing
6090 SURETY DRIVE, EL PASO, TX 79905
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237120
Employees
168
Ownership type
Private (A)

1 citation on file for this inspection.

Citation 01001

Serious Gravity 10 1 instance 5 exposed
Issued
Sep 21, 2012
Abate by
Sep 24, 2012
Penalty
Initial $4,200 · Current $2,520 Reduced
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.    On March 23, 2012, employees were working to replace a valve at the base of a 4 ? inch diameter X 48 foot long deluge pipe for Tank #158 at Western Refining North Tank Farm.  Employees cut the base of the vertical pipe which severed the base support prior to and without:   1.) conducting a survey of all hazardous energy involved  2.) assigning duties and responsibilities for personnel involved  3.) determining safe shut down, de-energization, and placement of energy control devices  4.) developing written procedures that involved means and methods of control and verification steps  5.) training personnel about the hazards and procedures involved.  This condition exposed employees to potential struck-by hazards.
Recent events (2)
  • · I (S) $2520
  • · Z (S) $4200

View Sun-Fab's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 332835081.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.