OSHA Inspection: JS CONSTRUCTION

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of JS CONSTRUCTION in 1401 ST. LOUIS AVE., SAINT LOUIS, MO 63107 (NAICS 238140). OSHA activity number 333297117.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch JS Construction — free Get an email when a new federal OSHA severe-injury report for JS Construction is published. One employer, no account, unsubscribe in one click.
Establishment
JS CONSTRUCTION
Site address
1401 ST. LOUIS AVE.
City
SAINT LOUIS
State
MO
ZIP
63107
Mailing
2438 PROUHET AVE., SAINT LOUIS, MO 63114
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
2
Ownership type
A

5 citations on file for this inspection.

1926.100 A

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Apr 16, 2012
Abate by
May 7, 2012
Penalty
Initial $2,640 · Current $0 Reduced
29 CFR 1926.100(a):     Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:    At the job site, an employee was working without a hard hat under/near an employee that was using a hand scraper and brick hammer on the second level of a tubular welded scaffold.  The employee on the second level of the tubular welded scaffold was approximately 14 feet, 10 inches above ground level.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $0
  • — Z (S) $2640

1926.451 F07

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Apr 16, 2012
Abate by
May 7, 2012
Penalty
Initial $4,620 · Current $0 Reduced
29 CFR 1926.451(f)(7):     Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:    At the job site, a worker was using a scraper and brick hammer to prepare window sills for recoating from the second level of a mobile tubular welded scaffold.  The second level (approximately 14 feet, 10 inches above ground level ) of the scaffold had open ends and no toe boards to protect ground personnel from falling objects.      Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $0
  • — Z (S) $4620

1926.451 G04 I

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Apr 16, 2012
Abate by
May 7, 2012
Penalty
Initial $4,620 · Current $0 Reduced
29 CFR 1926.451(g)(4)(i):     Guardrail system(s) were not installed along all open sides and ends of platforms:    At the job site, a worker was using a scraper and brick hammer to prepare window sills for recoating from the second level of a mobile tubular welded scaffold.  The second level (approximately 14 feet, 10 inches above ground level ) of the scaffold had open ends.      Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $0
  • — Z (S) $4620

1926.451 H02 II

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Apr 16, 2012
Abate by
May 7, 2012
Penalty
Initial $4,620 · Current $0 Reduced
29 CFR 1926.451(h)(2)(ii):     Toeboards were not installed on all open sides and ends of platforms more than 10 feet above the ground or floor:    At the job site, a worker was using a scraper and brick hammer to prepare window sills for recoating from the second level of a mobile tubular welded scaffold.  The second level (approximately 14 feet, 10 inches above ground level ) of the scaffold did not have toeboards erected along all open sides and ends.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $0
  • — Z (S) $4620

1926.454 A

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Apr 16, 2012
Abate by
May 7, 2012
Penalty
Initial $4,620 · Current $0 Reduced
29 CFR 1926.454(a):     The employer did not have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize those hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    At the job site, employee's were working from the first and second level of a mobile tubular welded scaffold did not receive training from a qualified person to include fall hazards, falling object hazards, and proper scaffold use.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $0
  • — Z (S) $4620

View JS Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 333297117.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.