OSHA Inspection: AEROPRES CORPORATION, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of AEROPRES CORPORATION, INC. in 6440 COLLLINS ROAD, MORRIS, IL 60450 (NAICS 325998). OSHA activity number 333308427.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Aeropres Corporation, INC. — free Get an email when a new federal OSHA severe-injury report for Aeropres Corporation, INC. is published. One employer, no account, unsubscribe in one click.
Site address
6440 COLLLINS ROAD
City
MORRIS
State
IL
ZIP
60450
Mailing
6440 COLLLINS ROAD, MORRIS, IL 60450
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325998
Employees
8
Ownership type
A

9 citations on file for this inspection.

1910.119 D

Serious Gravity 10 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Dec 1, 2012
Penalty
Initial $4,900 · Current $2,940 Reduced
29 CFR 1910.119(d):     The employer did not complete a compilation of written process safety information pertaining to the equipment in the process:    On or about April 10, 2012, the Aeropres Corporation, Inc., did not complete a compilation of written process safety information pertaining to the following equipment at its facility in Morris, Illinois:    a. Rotating Equipment: The information for the following equipment did not include definable criteria (acceptable limits) for continued service or removal from service.         i.   5 Corken Compressors       ii.  1 Corken Compressor, Model 491       iii.  1 Corken Regeneration Compressor, Model HG602       iv.  22 Blackmer Rotary Vane Pumps, Model #LGLD2 or #LGLD3       v.   2 Blackmer Rotary Vane Pumps, Model #LGL1.25       vi.  1 SIHI Impeller Pump Series ZTN    b. Valves:  The employer did not have data sheets for the following valves:         Pressure Relief Valves: RV 112, RV 621, RV 622, RV 625, RV 626, RV 720, RV 721, RV 820, RV 821, RV 822, RV 920,        RV 1802, RV 1802, RV 1805, RV 1810, RV 1902, RV 2002, RV 2102, RV 2207, RV 2208, RV 2209, RV 2210, RV 2212,        Two relief Valves on Tank #12 which have no identification number, one relief valve on the Reboiler Pressure Tank, one       relief valve on the Boiler Pressure Tank, and one relief valve on Sieve #1.         Process Valves: One globe valve with no identification number of Tank #12.           CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM
Recent events (2)
  • — I (S) $2940
  • — Z (S) $4900

1910.119 J02

Serious Gravity 10 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Dec 1, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(2):     The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment:    On or about April 10, 2012, Aeropres Corporation, Inc., did not establish or implement written procedures which included criteria for continued service or removal from service, to maintain the on-going integrity of the process equipment at its Morris, Illinois Facility, for the rotating equipment such as pumps and compressors.    CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 D03 I D

Other-than-serious 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Dec 31, 2012
Penalty
Initial $4,900 · Current $0 Reduced
29 CFR 1910.119(d)(3)(i)(D):     The employer did not include, in the process safety information compilation, the relief system design and the design basis:    On or about April 10, 2012, Aeropres Corporation, Inc., did not include in the process safety information compilation, the relief system design and the design basis for any of its pressure relief valves at its Morris, Illinois facility.    DOCUMENTATION AND CERTIFICATION IS REQUIRED OF THIS ITEM.
Recent events (2)
  • — I (O) $0
  • — Z (S) $4900

1910.119 D03 I F

Serious Gravity 5 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Dec 1, 2012
Penalty
Initial $3,500 · Current $2,100 Reduced
29 CFR 1910.119(d)(3)(i)(F):     The employer did not include, in the process safety information, the design codes and standards which were employed:    On or about April 10, 2012, Aeropres Corporation, Inc. did not include, in the process safety information, the design codes and standards which were employed for the following equipment at the Morris, Illinois facility:     a. Tank #5  b. Tank #7  c. Tank #9  d. Tank #10  e. Tank #12  f. Tank #13 - corrected during inspection  g. Tank #14 - corrected during inspection  h. Tank #17  i. Tank #22  j. Hot Oil Filter Tank  k. Sieve Tank #1  l. Sieve Tank # 2 - corrected during inspection  m. Sieve Tank #3  n. Sieve Tank #4 - corrected during inspection  o. Sieve Tank #5  p. The Boiler Pressure Tank  q. The Reboiler Pressure Tank    CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM
Recent events (2)
  • — I (S) $2100
  • — Z (S) $3500

1910.119 D03 II

Serious Gravity 10 1 instance 8 exposed
Issued
Oct 2, 2012
Penalty
Initial $4,900 · Current $2,940 Reduced
29 CFR 1910.119(d)(3)(ii):     The employer did not document that equipment complies with recognized and generally accepted good engineering practices:    On or about April 10, 2012, Aeropores Corporation, Inc., did not document that the two Catch Tanks, operating at a maximum allowable working pressure of 375 p.s.i., complied with recognized and generally accepted good engineering practices such as, but not limited to, ASME Pressure Vessel Code, Section VIII, Division 1.    CORRECTED DURING INSPECTION
Recent events (2)
  • — I (S) $2940
  • — Z (S) $4900

1910.119 E03 I

Serious Gravity 10 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Dec 1, 2012
Penalty
Initial $4,900 · Current $2,940 Reduced
29 CFR 1910.119(e)(3)(i):     The Process Hazard Analysis did not address the hazards of the process:    On or about April 10, 2012, Aeropres Corporation, Inc., did not address, in the Process Hazard Analysis for the Morris, Illinois facility, the hazards of the process such as the potential hazards associated with the utility systems.    CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM
Recent events (2)
  • — I (S) $2940
  • — Z (S) $4900

1910.119 E03 V

Serious Gravity 10 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Dec 31, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.119(e)(3)(v):     The process safety hazard analysis did not address facility siting:    On or about April 10, 2012, Aeropress Corporation, Inc., did not address, in the process hazard analysis for the Morris, Illinois facility, facility siting.    CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 J04 I

Serious Gravity 10 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Dec 31, 2012
Penalty
Initial $4,900 · Current $2,940 Reduced
29 CFR 1910.119(j)(4)(i):     The employer did not perform inspection and tests on process equipment:    On or about April 10, 2012, Aeropres Corporation, Inc., did not perform inspections and tests on the following process equipment:    a. Corken Compressors C101, C102, C201, C202, C2201 and 491: the liquid traps must be inspected and drained in accordance with recognized and generally accepted good engineering practices such as, but not limited to, the manufacturer's instructions.    b. Corken Regeneration Compressor Model HG602, the discharge pressure and the valve assemblies require routine inspection in accordance with recognized and generally accepted good engineering practices such as, but not limited to, the manufacturer's instructions.    c. All Compressors:  piston rings and oil pumps must be routinely inspected in accordance with recognized and generally accepted good engineering practices such as, but not limited to, the manufacturer's instructions.    d. Blackmer Pumps and Corken 1021 Model Pump: the inlet strainer must be inspected and cleaned on a routine basis in accordance with recognized and generally accepted good engineering practices such as, but not limited to, the manufacturer's instructions.    e. The following relief valves were not inspected and/or replaced in accordance with generally accepted and good engineering practices such as, but not limited to, API 510 Pressure Vessel Inspection Code: In-Service Inspection, Rating, Repair and Alteration: RV 102, RV 103, RV 104, RV 105, RV 106, RV 107, RV 112, RV 205, RV 206, RV 207, RV 208, RV 304, RV305, RV 404, RV 405, RV 406, RV 407, RV 408, RV 504, RV 505, RV 506, RV 507, RV 508, RV 509, RV 605, RV 606, RV 607, RV 608, RV 609, RV 612, RV 613, RV 614, RV 623, RV 624, RV 626, RV 705, RV 804, RV 922, RV 923, RV 1004, RV 1005, RV 1006, RV 1007, RV 1304, RV 1305, RV 1404, RV 1503, RV 1504, RV 1505, RV 1601, RV 1602, RV 1603, RV 1604, RV 2001, RV 2201, RV 2202, RV 2203, RV 2204, RV 2205, RV 2206, RVC 101, RVC 103, RVC 201, RVC 203, RV S1, RV S2, RV S3, RV S4, RV S5, RV S6, RV S7, RV S8, RV S9, RV S10, RV S11, RV S12, RV S13, RV S14, RV S15, RV S16, and RV H1.    CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM.
Recent events (2)
  • — I (S) $2940
  • — Z (S) $4900

1910.119 J04 II

Other-than-serious 1 instance 8 exposed
Issued
Oct 2, 2012
Abate by
Apr 2, 2018
Penalty
Initial $3,500 · Current $500 Reduced
29 CFR 1910.119(j)(4)(ii):     The inspection and testing procedures did not follow recognized and generally accepted good engineering practices:    On or about April 10, 2012, Aeropres Corporation, Inc., did not follow recognized and generally accepted good engineering practices during the inspection of its pressure vessels at the Morris, Illinois facility.  Specifically, an internal inspection was not conducted for the following vessels in accordance with recognized and generally accepted good engineering practices such as, but not limited to, API 510 Pressure Vessel Inspection Code: In-service Inspection, Rating, Repair and Alteration:  Pressure Vessels Tanks, #1 through #22, Filter Tank, Scrubber #1, Scrubber #2, Sieve Tank #1 through #5, Boiler Pressure Tank, Reboiler, and the Heat Exchanger.        CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM
Recent events (4)
  • — F (O) $500
  • — F (O) $3500
  • — C (S) $3500

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 333308427.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.