OSHA Inspection: M & M PLASTER & STUCCO, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of M & M PLASTER & STUCCO, INC. in 730 EAST BEACH BLVD, LONG BEACH, MS 39560 (NAICS 238310). OSHA activity number 333981850.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch M & M Plaster & Stucco, INC. — free Get an email when a new federal OSHA severe-injury report for M & M Plaster & Stucco, INC. is published. One employer, no account, unsubscribe in one click.
Site address
730 EAST BEACH BLVD
City
LONG BEACH
State
MS
ZIP
39560
Mailing
328 MARTIN COURT, MARIETTA, GA 30060
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
9
Ownership type
A

3 citations on file for this inspection.

1926.404 F06

Serious Gravity 5 1 instance 3 exposed
Issued
May 15, 2012
Penalty
Initial $1,600 · Current $834 Reduced
29 CFR 1926.404(f)(6): Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.    (a)  First floor of Health Science Lab, University of SO. MS Gulfport Campus, Long Beach MS - On or about April 12, 2012 an extension cord with two male ends and a pigtail with multiple outlets did not have grounding prongs.  The grounding prongs were missing.
Recent events (2)
  • — I (S) $834
  • — Z (S) $1600

1926.451 F04

Serious Gravity 5 7 instances 3 exposed
Issued
May 15, 2012
Penalty
Initial $1,600 · Current $833 Reduced
29 CFR 1926.451(f)(4): Any part of a scaffold damaged or weakened such that its strength is less than that required by paragraph (a) of this section shall be immediately repaired or replaced, braced to meet those provisions, or removed from service until repaired.      (a) Health/Science Lab, University of SO. MS Gulfport Campus, Long Beach - On or about April 12, 2012 the fabricated decking used for scaffold platforms had holes on each tier of the scaffold and some of the decking had cracks on the underside.
Recent events (2)
  • — I (S) $833
  • — Z (S) $1600

1926.451 G04 I

Serious Gravity 5 5 instances 3 exposed
Issued
May 15, 2012
Penalty
Initial $1,600 · Current $833 Reduced
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.    (a) Health Science Lab, University of SO. MS Gulfport Campus, Long Beach MS - On or about April 12, 2012 the scaffold used for plastering did not have end rails on the ladder access end of the scaffold.
Recent events (2)
  • — I (S) $833
  • — Z (S) $1600

View M & M Plaster & Stucco, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 333981850.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.