Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: J.A.G. GENERAL CONSTRUCTION, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of J.A.G. GENERAL CONSTRUCTION, LLC in HMS STAYNOR DRIVE, HINGHAM, MA 02043 (NAICS 236116). OSHA activity number 334094059.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J.A.G. General Construction, LLC — free Get an email when a new federal OSHA severe-injury report for J.A.G. General Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
HMS STAYNOR DRIVE
City
HINGHAM
State
MA
ZIP
02043
Mailing
17 WINDSOR STREET, WORCESTER, MA 01605
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
4
Ownership type
A

2 citations on file for this inspection.

1926.451 C02

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 20, 2012
Penalty
Initial $2,200 · Current $2,200
29 CFR 1926.451(c)(2):     Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.    At the site at the rear of Building 25:  Pump jack scaffold legs were not bearing on base plates when positioned on uncompacted soil.
Recent events (1)
  • — Z (S) $2200

1926.452 J02

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 20, 2012
Penalty
Initial $2,200 · Current $2,200
29 CFR 1926.452(j)(2):     Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom,top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.    At the site at the rear of Builidng 25:  Pump jack poles had not been secured to the building at the bottom.
Recent events (1)
  • — Z (S) $2200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334094059.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.