OSHA Inspection: LAKE IRON, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of LAKE IRON, INC. in 1140 GARFIELD ST., OAK PARK, IL 60304 (NAICS 238120). OSHA activity number 334142429.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Lake Iron, INC. — free Get an email when a new federal OSHA severe-injury report for Lake Iron, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
LAKE IRON, INC.
Site address
1140 GARFIELD ST.
City
OAK PARK
State
IL
ZIP
60304
Mailing
5520 W. LAKE ST., CHICAGO, IL 60644
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
Employees
7
Ownership type
A

17 citations on file for this inspection.

1926.251 A02 I

Serious Gravity 5 4 instances 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $1,600 · Current $800 Reduced
29 CFR 1926.251(a)(2)(i): The employer did not ensure that rigging equipment had permanently affixed and legible identification markings as prescribed by the manufacturer that indicate the recommended safe working load.    a) The employer did not ensure that synthetic web slings available for employee use at the site had legible identification markings that indicate the recommended safe working load.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

1926.251 E08

Serious Gravity 5 4 instances 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.251(e)(8): Synthetic web slings were not immediately removed from service when any of the following conditions specified in 1926.251(e)(8)(i) through (e)(8)(v) were present: (i) Acid or caustic burns; (ii) Melting or charring of any part of the sling surface; (iii) snags, punctures, tears, or cuts; (iv) broken or worn stiches; or (v) distortion of fittings:    a) Synthetic web slings on the truck at the site had snags, tears, melting or burns and were available for employee use and not removed from service.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.351 B04

Serious Gravity 5 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $1,600 · Current $800 Reduced
29 CFR 1926.351(b)(4): Welding cables in need of repair were used:     a) Welding cables that became worn to the extent of exposing bare conductors were being used by employees.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

1926.351 D01

Serious Gravity 5 1 instance 4 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.351(d)(1): Electrode holders were not placed or protected so that they could not make electrical contact with employees or conducting objects and electrodes (rods, etc.) were not removed from the electrode holder when the holder was left unattended:    a) Electrode holders were left where they could come into contact with conducting objects and the rod was left in the holder unattended.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B01

Serious Gravity 10 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $2,800 · Current $1,360 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:    a)  Employees engaged in construction work were not protected from fall hazards of up to approximately 18 feet to the ground while working along unprotected edge of the construction area below the steel structure.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1360
  • — Z (S) $2800

1926.451 F03

Serious Gravity 5 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jul 16, 2012
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    a) The tublar welded frame scaffold and scaffold components were not inspected by a competent person.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.454 A

Serious Gravity 5 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jul 16, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a):  The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    a)  Employees were not trained to recognize and eliminate the hazards associated with working from tubular wleded frame scaffolding.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.454 B

Serious Gravity 5 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jul 16, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question:    a) Employees were not trained in the recognition of hazards associated with erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a tubular welded frame scaffold.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 F14

Serious Gravity 10 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $2,800 · Current $1,400 Reduced
29 CFR 1926.451(f)(14): Makeshift devices, such as boxes and barrels were used on top of scaffold platforms to increase the working level height of employees:    a) A bucket was placed on top of a tubular welded frame scaffold platform to increase the height of that area of the scaffold.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 G01

Serious Gravity 10 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level:    a)  Employees were exposed to the hazard of falling up to approximatley 20 feet, while using the tubular welded frame scaffold platform to gain access to the steel structure.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1051 A

Serious Gravity 10 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1051(a): Stairways or ladders were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist was provided:    a) Employees were exposed to fall hazards of up to approximatelyy 28 feet, while they were accessing the roof deck from a bucket placed on a scaffold platform where there was a break in elevation greater than 19 inches.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.760 A01

Serious Gravity 5 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.760(a)(1): Each employee engaged in a steel erection activity who is on a walking/working surface with an unprotected side or edge more than 15 feet (4.6 m) above a lower level was not protected from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, positioning device systems, or fall restraint systems.    a) Employees were exposed to fall hazards of up to approximately 40 feet without while performing steel erection activities.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.760 D01

Serious Gravity 5 1 instance 4 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.760(d)(1): Guardrail systems, safety net systems, personal fall arrest systems, positioning device systems and their components did not conform to the criteria in  1926.502 (see Appendix G to this subpart):    a) The employer provided a horizontal lifeline for employee use that was not designed and installed by a qualified person as required by 1926.502(d)(8).    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.1053 B04

Serious Gravity 5 1 instance 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $1,600 · Current $800 Reduced
29 CFR 1926.1053(b)(4):  Ladder(s) were used for purposes other than the purpose for which they were designed:    a)  Employees were using an 8 foot red fiberglass step ladder in the closed/folded position to access work area. The ladder is designed to be used in the open/A-frame position    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

1926.350 A09

Other-than-serious 2 instances 5 exposed
Issued
Jun 8, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.350(a)(9): Compressed gas cylinders were not secured in an upright position at all times:    a) Cylinders of acetelyne and oxygen were stored on their sides in the back of a truck.    No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1926.352 D

Other-than-serious 2 instances 5 exposed
Issued
Jun 8, 2012
Abate by
Jun 11, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.352(d): Suitable fire extinguishing equipment was not immediately available in the work area(s) where welding, cutting, or heating was being performed:    a) There was no fire extinguishing equipment available where the employees were welding and cutting.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1926.701 B

Repeat 1 instance 5 exposed
Issued
Jun 8, 2012
Penalty
Initial $80 · Current $80
29 CFR 1926.701(b): All protruding reinforcing steel, onto and/or into which employees could fall or come against, was not guarded to eliminate the hazard of impalement:    a) Employees were exposed to impalement hazards from protruding unprotected reinforcing steel while performing support duties for steel work.    No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (R) $80
  • — Z (R) $80

View Lake Iron, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334142429.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.