THOMASVILLE, AL ·
OSHA Inspection: ENERGEX TUBE, LLC
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of ENERGEX TUBE, LLC in 6340 HWY 5 NORTH, THOMASVILLE, AL 36784 (NAICS 237120). OSHA activity number 334461332.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ENERGEX TUBE, LLC
- Site address
- 6340 HWY 5 NORTH
- City
- THOMASVILLE
- State
- AL
- ZIP
- 36784
- Mailing
- 6340 HWY 5 NORTH, THOMASVILLE, AL 36784
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237120
- Employees
- 110
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.95 D01
- Issued
- Jun 27, 2012
- Abate by
- Jul 12, 2012
- Penalty
- Initial $2,295 · Current $0 Reduced
8111
General-duty citation text
29 CFR 1910.95(d)(1): When information indicated that any employee's exposure equaled or exceed the 8-hour time-weighted average of 85 decibels, the employer did not develop and implement a monitoring program: a) Transfer table: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 106.9% (equivalent to an 8 hour TWA of 90.4) which is approximately 2.138 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 466 minute sampling period conducted. Exposure calculations include a zero increment for the 14 minute period not sampled. And the employer had not developed a monitoring program to ensure employees were adequately protected from noise. b) Cooling table: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 92.3% (equivalent to an 8 hour TWA of 89.4) which is approximately 1.846 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 478 minute sampling period conducted. Exposure calculations include a zero increment for the 2 minute period not sampled. And the employer had not developed a monitoring program to ensure employees were adequately protected from noise. c) Saw and Pick up Area: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 77.4% (equivalent to an 8 hour TWA of 88.1) which is approximately 1.548 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 471 minute sampling period conducted. Exposure calculations include a zero increment for the 9 minute period not sampled. And the employer had not developed a monitoring program to ensure employees were adequately protected from noise.
Recent events (3)
- · J (S) $0
- · C (S) $2295
- · Z (S) $2295
1910.95 I04
- Issued
- Jun 27, 2012
- Abate by
- Jul 12, 2012
- Penalty
- Initial $0 · Current $0
8111
General-duty citation text
29 CFR 1910.95(i)(4): The employer did not provide training in the use and care of all hearing protectors provided to employees: a) Transfer table: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 106.9% (equivalent to an 8 hour TWA of 90.4) which is approximately 2.138 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 466 minute sampling period conducted. Exposure calculations include a zero increment for the 14 minute period not sampled. Was not given training on the use of hearing protection. b) Cooling table: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 92.3% (equivalent to an 8 hour TWA of 89.4) which is approximately 1.846 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 478 minute sampling period conducted. Exposure calculations include a zero increment for the 2 minute period not sampled. Was not given training on the use of hearing protection. c) Saw and Pick up Area: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 77.4% (equivalent to an 8 hour TWA of 88.1) which is approximately 1.548 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 471 minute sampling period conducted. Exposure calculations include a zero increment for the 9 minute period not sampled. Was not given training on the use of hearing protection.
Recent events (3)
- · J (S) $0
- · C (S) $0
- · Z (S) $0
1910.95 K01
- Issued
- Jun 27, 2012
- Abate by
- Jul 12, 2012
- Penalty
- Initial $0 · Current $1,200
8111
General-duty citation text
29 CFR 1910.95(k)(1): The employer did not train each employee who is exposed to noise at or above an 8-hour time-weighted average of 85 decibels in accordance with the requirements of 29 CFR 1910.95(k). The employer did not institute a training program and ensure employee participation in the program: a) Transfer table: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 106.9% (equivalent to an 8 hour TWA of 90.4) which is approximately 2.138 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 466 minute sampling period conducted. Exposure calculations include a zero increment for the 14 minute period not sampled. Was not given hearing conservation training. b) Cooling table: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 92.3% (equivalent to an 8 hour TWA of 89.4) which is approximately 1.846 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 478 minute sampling period conducted. Exposure calculations include a zero increment for the 2 minute period not sampled. Was not given hearing conservation training. c) Saw and Pick up Area: On or about May 23, 2012: an employee moving pipe from on stage in the process to the next was exposed to continuous noise at a level of 77.4% (equivalent to an 8 hour TWA of 88.1) which is approximately 1.548 times the action level of 50% (equivalent to an 8 hour TWA of 85dBa) Results are based on a 471 minute sampling period conducted. Exposure calculations include a zero increment for the 9 minute period not sampled. Was not given hearing conservation training.
Recent events (3)
- · J (O) $1200
- · C (S) $0
- · Z (S) $0
More inspections in this industry (NAICS 237120)
More inspections in AL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334461332.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.