Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: VECTRON INTERNATIONAL, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of VECTRON INTERNATIONAL, INC. in 4914 GRAY ROAD, CINCINNATI, OH 45232 (NAICS 334310). OSHA activity number 334532934.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Vectron International, INC. for free Get an email when a new federal OSHA severe-injury report for Vectron International, INC. is published. One employer, no account, unsubscribe in one click.
Site address
4914 GRAY ROAD
City
CINCINNATI
State
OH
ZIP
45232
Mailing
4914 GRAY ROAD, CINCINNATI, OH 45232
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
334310
Employees
46
Ownership type
Private (A)

10 citations on file for this inspection.

1910.147 C05 I

Serious Gravity 5 4 instances 4 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $5,000 · Current $4,000 Reduced
29 CFR 1910.147(c)(5)(i):  Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware shall be provided by the employer for isolating, securing or blocking of machines or equipment from energy sources:    (a)  Employees were not provided with locks or tags to attach to the energy isolating devices, prior to cleaning and changing out the dicing blades and spacers on the Boyer Schultz Dicer.    (b)  Employees were not provided with locks or tags to attach to the energy isolating devices, prior to cleaning and changing out parts on the P.R. Hoffman Lappers.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (S) $4000
  • · Z (S) $5000

1910.147 C07 I

Serious Gravity 5 4 instances 4 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $5,000 · Current $0 Reduced
29 CFR 1910.147(c)(7)(i):  The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. The training shall include the following:      (a)  Employees were not trained on the energy control program, such as how and when to attach locks or tags to the energy isolating devices, prior to cleaning and changing out the dicing blades and spacers on the Boyer Schultz Dicer.    (b)  Employees were not trained on the energy control program, such as how and when to attach locks or tags to the energy isolating devices, prior to cleaning and changing out parts on the P.R. Hoffman Lappers.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $5000

1910.147 D03

Serious Gravity 5 4 instances 4 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $5,000 · Current $0 Reduced
29 CFR 1910.147(d)(3):  Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s):      (a)  Employees cleaned and changed out the dicing blades and spacers on the Boyer Schultz Dicer, without first isolating the energy sources.    (b)  Employees cleaned and changed out parts on the P.R. Hoffman Lappers, without first   isolating the energy sources.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $5000

1910.147 D04 I

Serious Gravity 5 4 instances 4 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(d)(4)(i):  Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees:      (a)  Employees cleaned and changed out the dicing blades and spacers on the Boyer Schultz Dicer, without first affixing a lockout device to the energy isolating device.    (b)  Employees cleaned and changed out parts on the P.R. Hoffman Lappers, without first affixing a lockout device to the energy isolating device.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.147 C06 I

Serious Gravity 5 4 instances 4 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $5,000 · Current $2,500 Reduced
29 CFR 1910.147(c)(6)(i):  The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed:      (a)  There was no periodic inspection of the energy control program.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (S) $2500
  • · Z (S) $5000

1910.212 A01

Serious Gravity 5 3 instances 2 exposed
Issued
Sep 5, 2012
Abate by
Nov 19, 2012
Penalty
Initial $5,000 · Current $2,500 Reduced
29 CFR 1910.212(a)(1):  Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. Examples of guarding methods are-barrier guards, two-hand tripping devices, electronic safety devices, etc.:      (a)  Employees operating the Grob Vertical Band Saw, were exposed to 1-1/2 inches of unguarded blade.    (b)  Employees operating the Clausing Machine Lathe, were exposed to the unguarded chuck.    (c)  The P.R. Hoffman Lapping Machine, Model PR-1, operator was exposed to a pinch point created by the outer drive gear, when she spun the outer drive gear with one hand while hitting an on/off switch with the other hand.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (S) $2500
  • · Z (S) $5000

1910.219 F03

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $5,000 · Current $2,000 Reduced
29 CFR 1910.219(f)(3):  Sprockets and chains. All sprocket wheels and chains shall be enclosed unless they are more than seven (7) feet above the floor or platform. Where the drive extends over other machine or working areas, protection against falling shall be provided. This subparagraph does not apply to manually operated sprockets:      (a)  The top of the vertical sprocket and chain leading to the motor on the side of the Boyer Schultz Dicer, was three feet off the floor but was not enclosed.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (S) $2000
  • · Z (S) $5000

1910.305 G02 III

Other-than-serious 2 instances 3 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $5,000 · Current $500 Reduced
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables shall be connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints or terminal screws:      (a)  There was one inch of outer insulation pulled away from where the 120 volt AC flexible power cord for coolant on the Boyer Schultz Dicer, exposing the inner insulated wires to damage and thereby exposing employees to an electrical hazard.    (b)  There were six inches outer insulation pulled away from the 120 volt AC wires running into the motor on the side of the Boyer Schultz Dicer, exposing the inner insulated wires to damage and thereby exposing employees to an electrical hazard.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (O) $500
  • · Z (S) $5000

1910.178 L01 I

Other-than-serious 1 instance 2 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.178(l)(1)(i):  The employer shall ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):      (a)  Forklift operators were not trained in forklift operation, to include formal instruction, practical training, and a performance evaluation.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

1910.178 Q07

Other-than-serious 1 instance 2 exposed
Issued
Sep 5, 2012
Abate by
Sep 26, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.178(q)(7):  Industrial trucks shall be examined before being placed in service, and shall not be placed in service if the examination shows any condition adversely affecting the safety of the vehicle. Such examination shall be made at least daily. Where industrial trucks are used on a round-the-clock basis, they shall be examined after each shift. Defects when found shall be immediately reported and corrected:    (a)  The forklift was not inspected prior to being placed into service.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

View Vectron International, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 334532934.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.