PHILADELPHIA, PA ·
OSHA Inspection: 17TH STREET GROUP, LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of 17TH STREET GROUP, LLC in 1036 N. LEITHGOW ST., PHILADELPHIA, PA 19123 (NAICS 236115). OSHA activity number 334561156.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- 17TH STREET GROUP, LLC
- Site address
- 1036 N. LEITHGOW ST.
- City
- PHILADELPHIA
- State
- PA
- ZIP
- 19123
- Mailing
- 228 DORIS AVE., HOLLAND, PA 18966
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 6
- Ownership type
- Private (A)
Citations
4 citations on file for this inspection.
1926.451 G01 VII
- Issued
- Jun 14, 2012
- Abate by
- Jun 19, 2012
- Penalty
- Initial $1,700 · Current $1,250 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a) 1036 N. Leithgow St.- Employees were exposed to a fall hazard of up to approximately 16 feet while working from the tubular welded frame scaffold which did not have the required guardrails along the ends and back of the active work platforms. Employees were doing masonry work including the installation of new brick to the exterior of the new house. Observed 6/5/2012. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1250
- · Z (S) $1700
1926.453 B02 V
- Issued
- Jun 14, 2012
- Abate by
- Aug 5, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.453(b)(2)(v): A body belt was not worn and/or a lanyard was not attached to the boom or basket when working from an aerial lift: Note: As of January 1, 1998, subpart M of this part (1926.502(d)) provides that body belts are not acceptable as part of a personal fall arrest system. The use of a body belt in a tethering system or in a restraint system is acceptable and is regulated a) 1036 N. Leithgow St., Genie Aerial Lift - An employee was exposed to a fall hazard of approximately 17 feet while working from the elevated aerial lift and not using the required personal fall arrest system. Onserved 6/5/2012 NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.451 B02
- Issued
- Jun 14, 2012
- Abate by
- Jun 19, 2012
- Penalty
- Initial $1,360 · Current $700 Reduced
General-duty citation text
29 CFR 1926.451(b)(2): Except as provided in paragraphs (b)(2)(i) and (b)(2)(ii) of this section, each scaffold platform and/or walkway was not at least 18 inches (46 cm) wide: a) 1036 N. Leithgow St. - The masons tender (laborer) was standing on a single 2 by 10 scaffold plank while at an elevation of approximately 12 feet above the sidewalk. Observed 6/5/2012. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $700
- · Z (S) $1360
1926.451 F06
- Issued
- Jun 14, 2012
- Abate by
- Jun 19, 2012
- Penalty
- Initial $1,360 · Current $700 Reduced
General-duty citation text
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). a) 1036 N. Leithgow St., Tubular Welded Frame Scaffold & Power Line - Portions of both the main 240 VAC power line and the service line that fed the structure were not appropriately protected. Sections of the insulated power lines that ran within two feet of the scaffold and through the scaffold did not have protective coverings installed. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $700
- · Z (S) $1360
More inspections in this industry (NAICS 236115)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 334561156.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.