OCALA, FL —
OSHA Inspection: BEST DRYWALL INTERIOR CONSTRUCTION, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BEST DRYWALL INTERIOR CONSTRUCTION, LLC in 7205 SOUTH EAST MARICAMP ROAD, OCALA, FL 34472 (NAICS 238130). OSHA activity number 334619434.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BEST DRYWALL INTERIOR CONSTRUCTION, LLC
- Site address
- 7205 SOUTH EAST MARICAMP ROAD
- City
- OCALA
- State
- FL
- ZIP
- 34472
- Mailing
- P.O. BOX 17161, CLEARWATER, FL 33762
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 4
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.451 B01
- Issued
- Jul 17, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform): a. On or about June 7, 2012, on the north side of the building, scaffold number 1 was not fully planked, in that the spaces between the planks were 18-inches, exposing employees to a 13-foot fall hazard. b. On or about June 7, 2012, on the north side of the building, scaffold number 2 was not fully planked, in that the spaces between the planks were 18-inches, exposing employees to a 13-foot fall hazard. c. On or about June 7, 2012, on the north side of the building, scaffold number 3 was not fully planked, in that the spaces between the planks were 18-inches,exposing employees to a 13-foot fall hazard.
Recent events (3)
- — A (S) $2800
- — I (S) $1400
- — Z (S) $2800
1926.451 B02
- Issued
- Jul 17, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(2): Scaffold platforms and walkways were not at least 18 inches wide: a. On or about June 7, 2012, on the north side of the building, scaffold number 1was planked with one 9-inch wooden plank, exposing employees to a 13-foot fall hazard. b. On or about June 7, 2012, on the north side of the building, scaffold number 2 was planked with one 14-inch aluminum expandable plank, exposing employees to a 13-foot fall hazard.
Recent events (3)
- — A (S) $0
- — I (S) $0
- — Z (S) $0
1926.451 C02
- Issued
- Jul 17, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a. On or about June 7, 2012, on the north side of the building, scaffold number 1 did not have base plates, mud sills or other adequate firm foundations. b. On or about June 7, 2012, on the north side of the building, scaffold number 2 did not have base plates, mud sills or other adequate firm foundations. c. On or about June 7, 2012, on the north side of the building, scaffold number 3 did not have base plates, mud sills or other adequate firm foundations.
Recent events (3)
- — A (S) $0
- — I (S) $0
- — Z (S) $0
1926.451 C03
- Issued
- Jul 17, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement: a. On or about June 7, 2012, on the north side of the building, scaffold number 1 did not have cross bracing between the lower frames and uprights to prevent swaying, exposing employees to a 13-foot fall hazard. b. On or about June 7, 2012, on the north side of the building, scaffold number 2 did not have cross bracing between the lower frames and uprights to prevent swaying, exposing employees to a 13-foot fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Jul 17, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Cross-braces were used as a means of access: a. On or about June 7, 2012, on the north side of the building, on scaffold number 2, employees used the cross members to access and egress the scaffold, exposing themselves to a 13-foot fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01
- Issued
- Jul 17, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. a. On or about June 7, 2012, on the north side of the building, scaffold number 2 did not have a guradrail system, exposing employees to a 13-foot fall hazard. b. On or about June 7, 2012, on the north side of the building, scaffold number 3 did not have a guard rail system, exposing employees to a 13-foot fall hazard.
Recent events (3)
- — A (S) $2800
- — I (S) $1400
- — Z (S) $2800
1926.451 F07
- Issued
- Jul 17, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person: a. On or about June 7, 2012, on the north side of the building, scaffold number 1, 2, and 3 were not erected by a competent person, exposing employees to a 13-foot fall hazard.
Recent events (3)
- — A (S) $2800
- — I (S) $1400
- — Z (S) $2800
1926.454 A
- Issued
- Jul 17, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performs work while on a scaffold(s) trained by a person qualified in the subject matter to recognize those hazards associated with the type of scaffold(s) being used and to understand the procedures to control or minimize those hazards: a. On or about June 7, 2012, on the north side of the building, employees preforming work while on scaffolds were not trained by a person qualified in the subject matter to recognize those hazards associated with the type of scaffold(s) being used and to understand the procedures to control or minimize those hazards, exposing employees to a 13-foot fall hazard.
Recent events (3)
- — A (S) $2800
- — I (S) $1400
- — Z (S) $2800
More inspections in this industry (NAICS 238130)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334619434.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.