HOUSTON, TX —
OSHA Inspection: DXI INDUSTRIES, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DXI INDUSTRIES, INC. in 1919 JACINTOPORT BLVD, HOUSTON, TX 77229 (NAICS 424690). OSHA activity number 334641594.
Where did this inspection happen?
- Establishment
- DXI INDUSTRIES, INC.
- Site address
- 1919 JACINTOPORT BLVD
- City
- HOUSTON
- State
- TX
- ZIP
- 77229
- Mailing
- 1919 JACINTOPORT BLVD, HOUSTON, TX 77229
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 424690
- Employees
- 64
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.119 J04 II
- Issued
- Sep 7, 2012
- Abate by
- Sep 17, 2012
- Penalty
- Initial $4,900 · Current $4,900
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspections and testing procedures performed on process equipment to maintain its mechanical integrity, did not follow recognized and generally accepted good engineering practices: On or about June 5, 2012, the employer did not ensure that testing of tank wall thickness at pre-designated areas to ensure mechanical integrity were performed on a chlorine heat exchanger (E101) in accordance with the employer's esablished procedure, Mechanical Integrity Process PSM 8.1, that the employer had developed from recognized and generally accepted good engineering practice guidance.
Recent events (3)
- — R (O) $4900
- — C (S) $4900
- — Z (S) $4900
1910.119 J04 III
- Issued
- Sep 7, 2012
- Abate by
- Sep 17, 2012
- Penalty
- Initial $4,900 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment to maintain its mechanical integrity, was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience: On or about June 5, 2012 in the employer did not ensure that visual inspection and testing procedures to ensure mechanical integrity were performed on process equipment, a chlorine heat exchanger (E101) in accordance with the employers established procedure, Mechanical Integrity Process PSM 8.1, that the employer had developed from recognized and generally accepted good engineering practice guidance documents.
Recent events (3)
- — R (R) $0
- — C (S) $4900
- — Z (S) $4900
More inspections in this industry (NAICS 424690)
BEAVERTON, OR—2026-07-15 00:00:00
317744263 - INPRIA CORP
HOPKINS, MN—2026-07-13 00:00:00
111581 - CHEMSOL LLC
DEERFIELD BEACH, FL—2026-07-10 00:00:00
OXYGEN DEVELOPMENT, L.L.C.
KATONAH, NY—2026-07-08 00:00:00
STRATCHEM LOGISTICS LLC
PAWTUCKET, RI—2026-07-08 00:00:00
SOLVENT DIRECT
More inspections in TX
RICHMOND, TX—2026-07-17 00:00:00
CORNELIUS NURSERIES, INC.
HOUSTON, TX—2026-07-17 00:00:00
HOLLOWAY HOUSTON, INC.
BONHAM, TX—2026-07-17 00:00:00
VOLUNTARY PURCHASING GROUPS, INC.
SNYDER, TX—2026-07-16 00:00:00
RNWBL
WICHITA FALLS, TX—2026-07-16 00:00:00
UNITED RENTALS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334641594.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.