MARSHALL, TX —
OSHA Inspection: PERGAN MARSHALL, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PERGAN MARSHALL, LLC in 710 BUSSEY ROAD, MARSHALL, TX 75670 (NAICS 325199). OSHA activity number 334793395.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PERGAN MARSHALL, LLC
- Site address
- 710 BUSSEY ROAD
- City
- MARSHALL
- State
- TX
- ZIP
- 75670
- Mailing
- 710 BUSSEY ROAD, MARSHALL, TX 75670
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325199
- Employees
- 42
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.22 A01
- Issued
- Dec 13, 2012
- Abate by
- Dec 26, 2012
- Penalty
- Initial $2,100 · Current $1,260 Reduced
General-duty citation text
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms, and service rooms were not kept clean and orderly and in a sanitary condition: This violation was discovered on July 27, 2012; in the maintenance parts warehouse where parts, pallets and equipment were cluttering up passageways.
Recent events (2)
- — I (S) $1260
- — Z (S) $2100
1910.22 A02
- Issued
- Dec 13, 2012
- Abate by
- Dec 26, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.22(a)(2): Floor(s) of workroom(s) were not maintained in a so far as possible, a dry condition: This violation was discovered on July 27, 2012; in the compressor room where water and oil on the floor resulted in a wet, slippery surface.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 E03 I
- Issued
- Dec 13, 2012
- Abate by
- Apr 1, 2013
- Penalty
- Initial $4,900 · Current $2,940 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address all hazards involved in the process: This violation was discovered on, July 6, 2012; where all utility systems that could affect or cause a release of highly hazardous chemicals or interfere in the mitigation of the consequences of a release were not addressed in the process hazard analysis.
Recent events (2)
- — I (S) $2940
- — Z (S) $4900
1910.119 J04 III
- Issued
- Dec 13, 2012
- Abate by
- Apr 1, 2013
- Penalty
- Initial $3,500 · Current $2,100 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, or more frequently if determined to be necessary by prior operating experience: This violation was discovered on August 16, 2012 as described below: a.) The Ultrasonic Thickness inspection for R-100 due on January 22, 2011 was not completed. b.) The External Visual inspection for R-100 due on November 28, 2008 was not completed. c.) The Ultrasonic Thickness inspection for R-200 due on October 04, 2011 was not completed. d.) The External Visual inspection for R-100 due on July 4, 2009 was not completed. e.) The Ultrasonic Thickness inspection for R-400A due on October 04, 2011 was not completed. f.) The External Visual inspection for R-400A due on October 04, 2011 was not completed. g.) The Internal inspection for R-400A due on August 16, 2012 was not completed. h.) The Ultrasonic Thickness inspection for R-400B due on October 04, 2011 was not completed. i.) The External Visual inspection for R-400B due on October 04, 2011 was not completed. j.) The Internal inspection for R-400B due on August 16, 2012 was not completed. k.) The Ultrasonic Thickness inspection for R-400C due on October 05, 2011 was not completed. l.) The External Visual inspection for R-400C due on October 05, 2011 was not completed. m.) The annual internal inspection for T-900 was last completed on October 9, 2007. n.) The annual internal inspection for T-910 was last completed on October 9, 2007. o.) The annual internal inspection for T-920 was last completed on October 9, 2007.
Recent events (2)
- — I (S) $2100
- — Z (S) $3500
1910.147 C04 II
- Issued
- Dec 13, 2012
- Abate by
- Dec 26, 2012
- Penalty
- Initial $3,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): The employer's energy control procedures did not include speciific steps or procedures to be followed for purging lines, tanks, or vessels: This violation was discovered on July 6, 2012; where employees performing maintenance activities did not have equipment specific procedures developed and documented to be utilized for the control of hazardous energy.
Recent events (2)
- — I (O) $0
- — Z (S) $3500
More inspections at Pergan Marshall, LLC
View Pergan Marshall, LLC's full OSHA safety record →
More inspections in this industry (NAICS 325199)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334793395.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.