Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: ACE ELECTRIC, INC.

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of ACE ELECTRIC, INC. in BUILDING 29702 FT. GORDON, AUGUSTA, GA 30905 (NAICS 238210). OSHA activity number 334985793.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ACE Electric, INC. for free Get an email when a new federal OSHA severe-injury report for ACE Electric, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
ACE ELECTRIC, INC.
Site address
BUILDING 29702 FT. GORDON
City
AUGUSTA
State
GA
ZIP
30905
Mailing
5500 E. PONCE DE LEON AVENUE, STONE MOUNTAIN, GA 30083
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
150
Ownership type
Private (A)

4 citations on file for this inspection.

1926.62 D02 I

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Sep 5, 2012
Penalty
Initial $4,500 · Current $0 Reduced

Hazardous substances 1591

29 CFR 1926.62(d)(2)(i):  Until the employer performed an employee exposure assessment as required in paragraph (d) of this section and documented that the employee performing any of the listed tasks was not exposed above the PEL, the employer did not treat the employee as if the employee were exposed above the PEL, and not in excess of ten (10) times the PEL, and did not implement employee protective measures prescribed in paragraph (d)(2)(v) of this section:    Ace Electric, Inc. - on or about June 6, 2012, employees cut/drilled through walls covered with lead-based paint.  The employer had not performed an exposure assessment and employees did not use protective equipment, including respiratory protection.  Four samples of paint were collected for laboratory analysis.  Lead was found in three, at 0.07%, 0.091%, and 0.035%.
Recent events (2)
  • · I (S) $0
  • · Z (S) $4500

1926.62 L01 I

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Sep 5, 2012
Penalty
Initial $4,500 · Current $0 Reduced

Hazardous substances 1591

29 CFR 1926.62(l)(1)(i):  The employer did not communicate information concerning lead hazards according to the requirements of OSHA's Hazard Communication Standard for the construction industry, 29 CFR 1926.59, including but not limited to the requirements concerning warning signs and labels, material safety datasheets (MSDS), and employee information and training:    Ace Electric, Inc. on or about June 6, 2012, employees drilled/cut through walls covered with lead-based paint.  Employees had not been trained on lead, its hazards, and appropriate protective measures.  Four samples of paint were collected for laboratory analysis.  Lead was detected in three, at 0.07%, 0.091%, and 0.035%.
Recent events (2)
  • · I (S) $0
  • · Z (S) $4500

1926.1101 F01 I

Deleted Other-than-serious 1 instance 2 exposed
Issued
Sep 5, 2012
Penalty
Initial $0 · Current $0

Hazardous substances 9020

29 CFR 1926.1101(f)(1)(i):  Where exposure monitoring was required under 29 CFR 1926.1101, the employer did not perform monitoring to determine accurately the airborne concentrations of asbestos to which employees were or potentially were exposed:    Ace Electric, Inc. - on or about June 6, 2012, employees drilled/cut through walls covered with PACM (mastic).  Monitoring had not been performed to determine the employees' exposure and appropriate protective measures.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

1926.1101 K03 I

Deleted Other-than-serious 1 instance 2 exposed
Issued
Sep 5, 2012
Penalty
Initial $0 · Current $0

Hazardous substances 9020

29 CFR 1926.1101(k)(3)(i):  Before the employer permitted its own employees to perform work subject to this standard in areas containing asbestos-containing material (ACM) and presumed asbestos-containing material (PACM), the employer did not identify the presence, location and quantity of asbestos containing material and/or presumed asbestos containing material therein pursuant to 29 CFR 1926.1101(k)(1):    Ace Electric, Inc. - on or about June 6, 2012, employees performed Class III asbestos work (disturbance of ACM/PACM by drilling/cutting).  The employer had not identified the presence, location, and quantity of ACM/PACM in the work area.  PACM (mastic) was present on walls which the employees drilled/cut through.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

View ACE Electric, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 334985793.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.