EAU CLAIRE, WI —
OSHA Inspection: WRR ENVIRONMENTAL SERVICES CO., INC.
Follow-up inspection · Health discipline
At a glance
On , OSHA opened a follow-up health inspection of WRR ENVIRONMENTAL SERVICES CO., INC. in 5200 RYDER ROAD, EAU CLAIRE, WI 54701 (NAICS 424690). OSHA activity number 335125191.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WRR ENVIRONMENTAL SERVICES CO., INC.
- Site address
- 5200 RYDER ROAD
- City
- EAU CLAIRE
- State
- WI
- ZIP
- 54701
- Mailing
- 5200 RYDER ROAD, EAU CLAIRE, WI 54701
What kind of inspection was it?
- Inspection type
- Follow-up (F)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 424690
- Employees
- 65
- Ownership type
- A
Citations
14 citations on file for this inspection.
1910.23 C01
- Issued
- Jan 4, 2013
- Abate by
- Jan 18, 2013
- Penalty
- Initial $2,800 · Current $1,960 Reduced
General-duty citation text
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings: (a) E-1 Building, E-1 Evaporator; Employees were exposed to a fall hazard due to lack of guarding on an open-sided platform approximately 7 feet high.
Recent events (2)
- — I (S) $1960
- — Z (S) $2800
1910.134 D01 III
- Issued
- Jan 4, 2013
- Abate by
- Apr 9, 2013
- Penalty
- Initial $2,100 · Current $1,470 Reduced
General-duty citation text
29 CFR 1910.134(d)(1)(iii): The employer did not identify and evaluate the respiratory hazard(s) in the workplace; including a reasonable estimate of employee exposures to respiratory hazards and identification of the contaminants chemical state and physical form: a) Fuels Building; The employer did not identify and evaluate the respiratory hazards associated with processes such as the barrel cutter, barrel crusher, and the pale press to ensure appropriate respirator protection factors.
Recent events (2)
- — I (S) $1470
- — Z (S) $2100
1910.134 D03 III B 2
- Issued
- Jan 4, 2013
- Abate by
- Feb 26, 2013
- Penalty
- Initial $2,800 · Current $1,960 Reduced
General-duty citation text
29 CFR 1910.134(d)(3)(iii)(B)(2): The employer did not implement a change schedule for respirators not equipped with an End of Service Life Indicator that would ensure cartridges were changed before the end of their service life: a) E-2 Tanker Pit; The employer did not implement a change schedule for half and/or full face elastomeric respirators with VOC cartridges (3M 6006) worn for protection during the Tanker Wash Process in which employees were exposed to methylene chloride. b) Fuels Building; The employer did not implement a change schedule for half face elastomeric respirators with VOC cartridges (3M 6006) worn for protection during processes such as barrel cutting, barrel crushing, and the pale press.
Recent events (2)
- — I (S) $1960
- — Z (S) $2800
1910.119 D03 I B
- Issued
- Jan 4, 2013
- Abate by
- Apr 9, 2013
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): Piping and instrument diagrams (P&ID's) were not updated on information pertaining to the equipment in the covered process: a) E-1 Building; P&IDs for the E-1 Evaporator were not updated with information pertaining to a new receiver, located near the feed pump (ID#71). b) E-1 Building; P&IDs for the F-1 Fractionation Still were not updated with information on the chilled water system; listed devices without tags, such as but not limited #111; and had devices with duplicated tags #63 and #64.
Recent events (2)
- — I (S) $2450
- — Z (S) $3500
1910.119 J02
- Issued
- Jan 4, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): Mechanical Integrity. Written procedures. The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment: a) Throughout covered processes; The employer did not establish written criteria and procedures for the inspection and testing of equipment such as, but not limited to, vessels, tanks, piping, various valves and sensors, RTDs, pumps, overflow alarms, level switches (i.e. GEMS High Level Switches ULS-100/10), and electrical equipment (i.e. GEMS SAFE-PAK on E-1 Evaporator).
Recent events (2)
- — I (S) $2450
- — Z (S) $3500
1910.119 J04 I
- Issued
- Jan 4, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $3,500 · Current $2,450 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(i): Mechanical Integrity. The employer did not perform inspection and tests on process equipment: a) Throughout covered processes; The employer did not perform inspections and testing of equipment such as, but not limited to, various valves and sensors, RTDs, pumps, and electrical equipment (i.e. GEMS SAFE-PAK on E-1 Evaporator). Systems included the following: 1) Molecular Sieve; Safety systems such as, but not limited to, relief valves (i.e. ID 7, 17), level switches (i.e. 27, 28), float valves, pop-off valves, etc. 2) F-1 Fractionation Still; Safety systems such as, but not limited to, pop-off valves (i.e. ID 74), RTDs (63, 98, 99), etc. 3) F-2 Fractionation Still; Safety systems such as, but not limited to, pressure relief valves (i.e. ID 17, 41, 46), pressure switches (i.e. ID 136), level switches, etc. 3) F-3 Fractionation Still; Safety systems such as, but not limited to, level switches, pressure sensors (i.e. ID 47), pressure safety relief devices (i.e. ID 23), pop-off valves (i.e. ID 45), RTDs (i.e. ID 100), etc. 4) F-4 Fractionation Still; Safety systems such as, but not limited to, pop-off valves (i.e. ID 135, 164), etc. 5) R-1 Reactor; Safety systems such as, but not limited to, pressure safety relief devices (i.e. ID 132, 133), pop-off valves (i.e. ID 45, 57, 58, 59, 60), etc. 6) R-4 (PLA) Reactor; Safety systems such as, but not limited to pressure safety relief valves, temperature switches, RTDs, regulators, etc. 7) R-2 Reactor; Safety systems such as, but not limited to pressure safety relief devices. 8) E-4 Evaporator; Safety systems such as, but not limited to, high and low level sensors, pop-off valves (i.e. ID 59, 6, 55), rupture discs (i.e. ID 75, 76), RTDs (i.e. 171) etc. 9) Delta-T; Safety systems such as, but not limited to, level sensors (i.e. ID 45, 46, 47), pop-off valves (i.e. ID 64, 184), pressure sensors (i.e. ID 73), etc. 10) Nitrogen system; Safety systems such as, but not limited to, pressure safety relief valves (i.e. ID 200, 210, 231, 237), etc. 11) Fuel Blending; Safety systems such as, but not limited to, pressure safety relief valves, oxygen sensors, etc. 12) E-23 Evaporator; Safety systems such as, but not limited to, pop-off valves (i.e. ID 8, 42, 67), RTDs (i.e. ID 148, 225, 264, 268), pressure switches, mass flow sensors (i.e. ID 244), etc. 13) E-1 Evaporator; Safety systems such as, but not limited to, pressure safety relief valves (i.e. ID 46, 147), pop-off valves (i.e. ID 44), RTDs (i.e. ID 105, 109, 116, 119), etc.
Recent events (2)
- — I (S) $2450
- — Z (S) $3500
1910.119 J04 IV
- Issued
- Jan 4, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(j)(4)(iv): Mechanical Integrity. The employer did not document each inspection and test that had been performed on process equipment: a) Throughout covered processes; The employer did not document inspections and testing of equipment such as, but not limited to, various valves and sensors, RTDs, pumps, and electrical equipment (i.e. GEMS SAFE-PAK on E-1 Evaporator). Systems included the following: 1) Molecular Sieve; Safety systems such as, but not limited to, relief valves (i.e. ID 7, 17), level switches (i.e. 27, 28), float valves, pop-off valves, etc. 2) F-1 Fractionation Still; Safety systems such as, but not limited to, pop-off valves (i.e. ID 74), RTDs (63, 98, 99), etc. 3) F-2 Fractionation Still; Safety systems such as, but not limited to, pressure relief valves (i.e. ID 17, 41, 46), pressure switches (i.e. ID 136), level switches, etc. 3) F-3 Fractionation Still; Safety systems such as, but not limited to, level switches, pressure sensors (i.e. ID 47), pressure safety relief devices (i.e. ID 23), pop-off valves (i.e. ID 45), RTDs (i.e. ID 100), etc. 4) F-4 Fractionation Still; Safety systems such as, but not limited to, pop-off valves (i.e. ID 135, 164), etc. 5) R-1 Reactor; Safety systems such as, but not limited to, pressure safety relief devices (i.e. ID 132, 133), pop-off valves (i.e. ID 45, 57, 58, 59, 60), etc. 6) R-4 (PLA) Reactor; Safety systems such as, but not limited to pressure safety relief valves, temperature switches, RTDs, regulators, etc. 7) R-2 Reactor; Safety systems such as, but not limited to pressure safety relief devices. 8) E-4 Evaporator; Safety systems such as, but not limited to, high and low level sensors, pop-off valves (i.e. ID 59, 6, 55), rupture discs (i.e. ID 75, 76), RTDs (i.e. 171) etc. 9) Delta-T; Safety systems such as, but not limited to, level sensors (i.e. ID 45, 46, 47), pop-off valves (i.e. ID 64, 184), pressure sensors (i.e. ID 73), etc. 10) Nitrogen system; Safety systems such as, but not limited to, pressure safety relief valves (i.e. ID 200, 210, 231, 237), etc. 11) Fuel Blending; Safety systems such as, but not limited to, pressure safety relief valves, oxygen sensors, etc. 12) E-23 Evaporator; Safety systems such as, but not limited to, pop-off valves (i.e. ID 8, 42, 67), RTDs (i.e. ID 148, 225, 264, 268), pressure switches, mass flow sensors (i.e. ID 244), etc. 13) E-1 Evaporator; Safety systems such as, but not limited to, pressure safety relief valves (i.e. ID 46, 147), pop-off valves (i.e. ID 44), RTDs (i.e. ID 105, 109, 116, 119), etc.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 L02 II
- Issued
- Jan 4, 2013
- Abate by
- Feb 4, 2013
- Penalty
- Initial $4,200 · Current $2,940 Reduced
General-duty citation text
29 CFR 1910.119(l)(2)(ii): Management of Change. Procedures did not address the impact of change on safety and health: a) Throughout the covered processes; Management of Change procedures such as, but not limited to, MOC 2012-0504-1, 2012-0207-1, 2012-0605-1, 2012-0713-1, 2012-0718-2, 2012-0723-1, 2012-0808-1, 2012-0815-1, 2012-0830-3, and 2012-0913-1, did not address the impact of change on safety and health.
Recent events (2)
- — I (S) $2940
- — Z (S) $4200
1910.119 L02 V
- Issued
- Jan 4, 2013
- Abate by
- Jan 31, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(l)(2)(v): Management of Change. Procedures did not ensure authorization requirements for the proposed change were properly addressed: a) Throughout the covered processes; Management of Change documentation such as, but not limited to, MOC 2012-0504-1, 2012-0207-1, 2012-0605-1, 2012-0713-1, 2012-0718-2, 2012-0723-1, 2012-0808-1, 2012-0815-1, 2012-0830-3, 2012-0913-1, and 2012-0913-2, did not ensure authorization before the implementation of change.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.305 J01 I
- Issued
- Jan 4, 2013
- Abate by
- Jan 18, 2013
- Penalty
- Initial $2,100 · Current $0 Reduced
General-duty citation text
29 CFR 1910.305(j)(1)(i): Rosettes and cleat-type lampholders and receptacles located less than 2.44 m (8 feet) above the floor had exposed terminals: a) E-1 Woodshop; Fluorescent light fixtures were located approximately 6 feet 11 inches from the ground.
Recent events (2)
- — I (O) $0
- — Z (S) $2100
1910.1052 D02
- Issued
- Jan 4, 2013
- Abate by
- Apr 9, 2013
- Penalty
- Initial $4,200 · Current $2,940 Reduced
General-duty citation text
29 CFR 1910.1052(d)(2): The employer did not perform initial monitoring to determine each employee's exposure to methylene chloride: a) E-2 Tanker Pit, Tanker Wash Process; The employer did not perform initial monitoring to determine employees exposure to methylene chloride.
Recent events (2)
- — I (S) $2940
- — Z (S) $4200
1910.1052 L01
- Issued
- Jan 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1052(l)(1): The employer did not provide information and training for each affected employee prior to or at the time of initial assignment to a job involving potential exposure to methylene chloride: a) E-2 Tanker Pit, Tanker Wash Process; The employer did not provide hazard communication training based on the hazards associated with methylene chloride at the time of initial assignment or thereafter.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 J02
- Issued
- Jan 4, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $7,000 · Current $4,900 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): Mechanical Integrity. Written procedures. The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment: a) E-II Sludge Tanks; The facility did not provide written criteria and procedures for the inspection and testing of equipment level switches (i.e. GEMS Sensors ULS-100/10 Ultrasonic Liquid Level Switches). WRR Environmental Services Co., Inc. was previously cited for a violation of this Occupational Safety and Health standard (29 CFR 1910.119(j)(2)), which was contained in OSHA inspection number 313178154, citation number 2 item 11a and was affirmed as final order on January 6, 2011, with respect to their workplace located at 5200 Ryder Road, Eau Claire, WI.
Recent events (2)
- — I (R) $4900
- — Z (R) $7000
1910.119 J04 I
- Issued
- Jan 4, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(j)(4)(i): Mechanical Integrity. The employer did not perform inspection and tests on process equipment: a) E-II Sludge Tanks; The facility did not perform inspections and testing of equipment level switches (i.e. GEMS High Level Switches ULS-100/10 Ultrasonic Liquid Level Switches): WRR Environmental Services Co., Inc. was previously cited for a violation of this Occupational Safety and Health standard (29 CFR 1910.119(j)(4)(i)), which was contained in OSHA inspection number 313178154, citation number 2 item 11b and was affirmed as final order on January 6, 2011, with respect to their workplace located at 5200 Ryder Road, Eau Claire, WI.
Recent events (2)
- — I (R) $0
- — Z (R) $0
More inspections at WRR Environmental Services CO., INC.
View WRR Environmental Services CO., INC.'s full OSHA safety record →
More inspections in this industry (NAICS 424690)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335125191.