OSHA Inspection: BRUCE MARTIN CONSTRUCTION, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of BRUCE MARTIN CONSTRUCTION, INC. in 105 E. COTTON ST., PORTAGEVILLE, MO 63873 (NAICS 238990). OSHA activity number 335318788.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Bruce Martin Construction, INC. for free Get an email when a new federal OSHA severe-injury report for Bruce Martin Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
105 E. COTTON ST.
City
PORTAGEVILLE
State
MO
ZIP
63873
Mailing
P.O. BOX 126, PORTAGEVILLE, MO 63873
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238990
Employees
4
Ownership type
A

12 citations on file for this inspection.

1926.501 B11

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $1,360 · Current $680 Reduced
29 CFR 1926.501(b)(11):     Each employee on a steep roof with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket, lanyards were unattached by two of three employees because of insufficient lanyard length to access the work (removing roof panels; eave of lowest roof was over 12 ft.).    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $680
  • · Z (S) $1360

1926.503 A02 III

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.503(a)(2)(iii):     The employer did not assure that each employee had been trained, as necessary, by a competent person in the use and operation of guardrail systems and personal fall arrest sytems.    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket employees were not trained on the specific fall protection systems used on this job, including the requirement for engineered specific lanyard attachment points, how to safely attach lanyard snaphooks (not tying off to lanyard webbing or to the man-basket support cable), and the correct lanyards and length in order to do the work required.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1501 G08 I

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1501(g)(8)(i):     A meeting attended by the crane operator and employees to be lifted and responsible for the task to be performed to review the appropriate requirements of paragraph (g) of 1926.550 and the procedures to be followed was not held:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket, a meeting to review the requirments of 1926.550, such as how to attach lanyards as well as capacity of the basket, and procedures to be followed, such as the length and type (such as retractable) of lanyards needed to do the work, was not held.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.502 D06 I

Serious Gravity 1 1 instance 1 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $1,020 · Current $510 Reduced
29 CFR 1926.502(d)(6)(i):     A snaphook not of the locking type was engaged directly to webbing of its lanyard:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket at least one employee tied his lanyard back to itself.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $510
  • · Z (S) $1020

1926.502 D15

Serious Gravity 1 1 instance 1 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(15):     Anchorage points used for attachment of personal fall arrest equipment were not independent of any anchorage point being used to support or suspend platforms and capable of supporting at least 5,000 pounds (22.2 kN) per employee:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket at least one employee tied his lanyard to the basket support cable.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.502 D23

Serious Gravity 1 1 instance 1 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(23):     Personal fall arrest systems were attached to guardrail systems:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket at least one employee tied his lanyard to the basket railing (without smooth, rounded edges).    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1501 G04 I A

Serious Gravity 1 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $1,020 · Current $510 Reduced
29 CFR 1926.1501(g)(4)(i)(A):     The personnel platform and suspension system was not designed by a qualified engineer or a qualified person competent in structural design:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket the equipment was not designed by an engineer or a competent person as evidenced by the following grouped violations (Citation 1, Items 3b through 3e).    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $510
  • · Z (S) $1020

1926.1501 G04 II A

Serious Gravity 1 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1501(g)(4)(ii)(A):     The personnel platform was not equipped with a guardrail system that was enclosed at least from the toeboard to mid-rail with either solid construction or expanded metal having openings no greater than 1/2 inch.     a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket the guardrail system was not enclosed from the toeboard to mid-rail.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1501 G04 II B

Serious Gravity 1 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1501(g)(4)(ii)(B):     A grab rail was not installed inside the entire perimeter of the personnel platform:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket there was no grab rail inside the guardrail system.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1501 G04 II I

Serious Gravity 1 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1501(g)(4)(ii)(I):     The personnel platform was not conspicuously posted with a plate or other permanent marking which indicated the weight of the paltform and its rated load capacity or maximum intended load:     a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket there was no weight and maximum intended load marking on the equipment.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1501 G04 IV B

Serious Gravity 1 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1501(g)(4)(iv)(B):     Hooks on attachment assemblies were not of a type that could be closed and locked, eliminating the throat opening:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket the platform was attached to cables with the throat opening of the hooks wired with baling wire (or equivalent).    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1501 G05 I

Other-than-serious 1 instance 3 exposed
Issued
Jul 31, 2012
Abate by
Sep 12, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1501(g)(5)(i):     A trial lift with the unoccupied personnel platform loaded at least to the anticipated liftweight was not made from ground level to each location at which the personnel platform was to be hoisted and positioned.  A trial lift was not performed immediately prior to placing personnel on the platform:    a. At 105 E. Cotton St, Portageville, on 7-22-12, where employees were lifted to work on a 7:12 pitch roof in a man basket a trial lift was not made.  (Note: a trial lift is required whenever the crane is moved and just before the actual lift of personnel is made, the platform is to be hoisted a few inches and one final inspection made.  See 1926.550(g)(5)(i) through (vi).)    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335318788.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.