FLORISSANT, MO —
OSHA Inspection: WHITE AUTO BODY
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of WHITE AUTO BODY in 8300 N. LINDBERGH BLVD., FLORISSANT, MO 63031 (NAICS 811121). OSHA activity number 335322434.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WHITE AUTO BODY
- Site address
- 8300 N. LINDBERGH BLVD.
- City
- FLORISSANT
- State
- MO
- ZIP
- 63031
- Mailing
- 8300 N. LINDBERGH BLVD., FLORISSANT, MO 63031
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 811121
- Employees
- 30
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.106 E02 IV A
- Issued
- Aug 1, 2012
- Abate by
- Sep 13, 2012
- Penalty
- Initial $1,575 · Current $1,103 Reduced
General-duty citation text
29 CFR 1910.106(e)(2)(iv)(a): Flammable liquids were not kept in covered containers when not actually in use: a. In the mix room a few open containers of flammable thinner were used to clean parts; the containers were not of the safety type designed for use of flammable liquids. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $1102.5
- — Z (S) $1575
1910.334 A03 I
- Issued
- Aug 1, 2012
- Abate by
- Sep 13, 2012
- Penalty
- Initial $1,575 · Current $1,103 Reduced
General-duty citation text
29 CFR 1910.334(a)(3)(i): A flexible cord used with grounding type equipment did not contain an equipment grounding conductor: a. Such as, but not limited to, in the spray booth building, a 110 V fan with an equipment grounding wiring, was plugged into an extension cord with a missing ground pin. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $1102.5
- — Z (S) $1575
1910.305 G02 III
- Issued
- Aug 1, 2012
- Abate by
- Sep 13, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws: a. In the detail area, the plug to a power cord used with the vacuum was damaged allowing tension to the terminal screws. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 II
- Issued
- Aug 1, 2012
- Abate by
- Sep 13, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section: a. Lockout of vehicles was not included in the company written lockout program. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 G01
- Issued
- Aug 1, 2012
- Abate by
- Sep 13, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(1): Employers did not have a safety data sheet in the workplace for each hazardous chemical which they used: a. Material safety data sheets were not kept for welding/cutting gases and rods/wire. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at White Auto Body
View White Auto Body's full OSHA safety record →
More inspections in this industry (NAICS 811121)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335322434.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.