Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,124Inspections Most recent open 2026-08-25 Last loaded 2026-08-28

OSHA Inspection: QUOYESER PRINT SHOP, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of QUOYESER PRINT SHOP, INC. in 800 LOUISIANA AVENUE, LAFAYETTE, LA 70501 (NAICS 323110). OSHA activity number 335362380.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Quoyeser Print Shop, INC. for free Get an email when a new federal OSHA severe-injury report for Quoyeser Print Shop, INC. is published. One employer, no account, unsubscribe in one click.
Site address
800 LOUISIANA AVENUE
City
LAFAYETTE
State
LA
ZIP
70501
Mailing
501 SURREY STREET, LAFAYETTE, LA 70501
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
323110
Employees
38
Ownership type
Private (A)

2 citations on file for this inspection.

1910.147 C01

Serious Gravity 5 2 instances 2 exposed
Issued
Nov 16, 2012
Abate by
Dec 1, 2012
Penalty
Initial $3,150 · Current $1,890 Reduced
29 CFR 1910.147(c)(1):  The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative:      On or about July 19, 2012, the employer failed to ensure that a lockout/tagout (LOTO) program was developed for the following equipment:    1) Cutter in the label shop; employee(s) perform LOTO on the cutter if the machine breaks or needs to be oiled. The machine has two power sources, air and electric.     2) Heidelberg plate machine in the print shop/plate processing room; every 3 or 4 months employee(s) change chemicals and filters on the plate machine and remove jams when they occur. The Heidelberg plate machine has two power sources, air and electric.
Recent events (2)
  • · I (S) $1890
  • · Z (S) $3150

1910.305 A02 I B

Serious Gravity 5 2 instances 2 exposed
Issued
Nov 16, 2012
Abate by
Dec 1, 2012
Penalty
Initial $3,150 · Current $1,890 Reduced
29 CFR 1910.305(a)(2)(i)(B): Temporary electrical power and lighting installations of 600 volts, nominal, or less was used for a period exceeding 90 days.     On or about July 19, 2012, the employer failed to ensure that permanent electrical outlets were installed in the label shop. Extension cords were being used as permanent wiring for the Jogger (scale) and conveyor for recyclable paper.
Recent events (2)
  • · I (S) $1890
  • · Z (S) $3150

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 335362380.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.