NELLIS AFB, NV ·
OSHA Inspection: NELLIS AIR FORCE BASE, HVAC SHOP
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of NELLIS AIR FORCE BASE, HVAC SHOP in CEOIH, BUILDING 807, NELLIS AFB, NV 89191 (NAICS 928110). OSHA activity number 335366787.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NELLIS AIR FORCE BASE, HVAC SHOP
- Site address
- CEOIH, BUILDING 807
- City
- NELLIS AFB
- State
- NV
- ZIP
- 89191
- Mailing
- HEADQUARTERS 99TH AIR BASE WING (ACC) BUILDING 7, NELLIS AFB, NV 89191
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 928110
- Employees
- 4
- Ownership type
- Federal government (D)
Citations
4 citations on file for this inspection.
1910.242 B
- Issued
- Sep 25, 2012
- Abate by
- Oct 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.: a) At the Heating Ventilation and Air Conditioning (HVAC) Shop on or about May 31st, 100 psi compressed air generated by air reciever compressor model 918, serial no. 1224 was used to clean HVAC equipment.
Recent events (1)
- · Z (S) $0
1910.303 B01 II
- Issued
- Sep 25, 2012
- Abate by
- Oct 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(b)(1)(ii): Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided: a) At the HVAC shop on or about 31 May 12, there was a cracked Ground Fault Circuit Interrupter (GFCI) faceplate two feet above above wash basin.
Recent events (1)
- · Z (S) $0
1910.305 G02 III
- Issued
- Sep 25, 2012
- Abate by
- Oct 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cord was was not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: a) At the HVAC shop on or about 29th May 2012, the outer sheath of the flexible cord used to power the Rigid pipe threading machine was pulled away from the plug.
Recent events (1)
- · Z (S) $0
1910.334 A02 II
- Issued
- Sep 25, 2012
- Abate by
- Oct 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.334(a)(2)(ii): Defective and evidence of damage to items that may expose an employee to injury was not removed from service: a) At the HVAC shop on or about 29th May 2012, the flexible cord used to power the Rigid pipe threading machine was allowed to be used with separated sheath insulation at plug connection.
Recent events (1)
- · Z (S) $0
More inspections at Nellis AIR Force Base, Hvac Shop
View Nellis AIR Force Base, Hvac Shop's full OSHA safety record →
More inspections in this industry (NAICS 928110)
More inspections in NV
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 335366787.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.