OSHA Inspection: TENNESSEE PIPELINE CONSTRUCTION COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of TENNESSEE PIPELINE CONSTRUCTION COMPANY in INTERSECTION OF HOUSTON ST & CRESTWELL, SAN ANTONIO, TX 78220 (NAICS 237120). OSHA activity number 335450383.

Watch Tennessee Pipeline Construction Company — free Get an email when a new federal OSHA severe-injury report for Tennessee Pipeline Construction Company is published. One employer, no account, unsubscribe in one click.
Site address
INTERSECTION OF HOUSTON ST & CRESTWELL
City
SAN ANTONIO
State
TX
ZIP
78220
Mailing
P.O. BOX 250, SINTON, TX 78387
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237120
Employees
8
Ownership type
A

4 citations on file for this inspection.

1926.350 A09

Serious Gravity 1 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $2700.00 · Current $1620.00 Reduced
29 CFR 1926.350(a)(9):     Compressed gas cylinder(s) were not secured in an upright position:                                                                                                                                          On or about 07/13/12, an employee was exposed to a fire hazard while performing Oxygen/Acetylene torch cutting in a grassy field with the Oxygen compressed gas cylinder lying on its side.
Recent events (2)
  • — I (S) $1620
  • — Z (S) $2700

1926.350 H

Serious Gravity 5 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $3600.00 · Current $2160.00 Reduced
29 CFR 1926.350(h):     Oxygen, and fuel gas pressure regulators, or their related gauges were not in proper working order while in use:                                                                                                                         On or about 07/13/12, an employee was exposed to a fire hazard while performing Oxygen/Acetylene torch cutting in a grassy field with a defective Acetylene gauge.
Recent events (2)
  • — I (S) $2160
  • — Z (S) $3600

1926.352 D

Serious Gravity 5 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $3600.00 · Current $2160.00 Reduced
29 CFR 1926.352(d):     Suitable fire extinguishing equipment was not immediately available in the work area(s) where welding, cutting, or heating was being performed:        On or about 07/13/12, an employee was exposed to a fire hazard while performing Arc welding and Torch cutting in a field without a fire extinguisher readily available.
Recent events (2)
  • — I (S) $2160
  • — Z (S) $3600

1926.652 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3600.00 · Current $2160.00 Reduced
29 CFR 1926.652(a)(1):     Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c). The employer had not complied with the provisions of 29 CFR 1926.652(b)(1)(i) in that the excavation was sloped at an angle steeper than one and one-half horizontal to one vertical (34 degrees measured from the horizontal):            On or about 07/13/12, an employee was exposed to a caught in/struck by hazard while working in a trench which did not have cave in protection.  The employee walked through the unprotected section while entering and exiting the trench.  The dimensions of the uprotected trench measuring approximately 20'L x7'6"D x  7'W.
Recent events (2)
  • — I (S) $2160
  • — Z (S) $3600

View TENNESSEE PIPELINE CONSTRUCTION COMPANY's full OSHA safety record →