OSHA Inspection: SHENG SHENG CONSTRUCTION INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SHENG SHENG CONSTRUCTION INC. in 60-20 MARATHON PARKWAY, LITTLE NECK, NY 11362 (NAICS 236116). OSHA activity number 335515193.

Watch Sheng Sheng Construction INC. — free Get an email when a new federal OSHA severe-injury report for Sheng Sheng Construction INC. is published. One employer, no account, unsubscribe in one click.
Site address
60-20 MARATHON PARKWAY
City
LITTLE NECK
State
NY
ZIP
11362
Mailing
17-17 166 STREET, WHITESTONE, NY 11357
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
5
Ownership type
A

7 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $2000.00 · Current $1000.00 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:    a) On or before July 30, 2012Job Site at 60-20 Marathon Parkway Little Neck, NY 11362    Employees working 9-feet below the nest higher level are exposed to overhead hazards from tools, and concrete masonry units.  	    WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED PURSUANT TO CFR 1903.19.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.102 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:    a) On or before July 30, 2012Job Site at 60-20 Marathon Parkway Little Neck, NY 11362  Employee using drill without eye protection.    	  WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED PURSUANT TO CFR 1903.19.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.403 B02

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $2000.00 · Current $1000.00 Reduced
29 CFR 1926.403(b)(2): Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification:    a) On or before July 30, 2012Job Site at 60-20 Marathon Parkway Little Neck, NY 11362    Employees exposed to un-mounted electrical outlet exposing employees to electrical shocks	    WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED PURSUANT TO CFR 1903.19.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.405 G02 IV

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:    a) On or before July 30, 2012Job Site at 60-20 Marathon Parkway Little Neck, NY 11362    Employees were exposed to a flexible ford set without strain relief to an un-mounted electrical box.    WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED PURSUANT TO CFR 1903.19.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $2000.00 · Current $1000.00 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights:     a) On or before July 30, 2012Job Site at 60-20 Marathon Parkway Little Neck, NY 11362    Employees working on two 6-inch planks at 6-feet 4-inches above the next lower level on tubular welded frame scaffold.    WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED PURSUANT TO CFR 1903.19.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.451 E01

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access:    a) On or before July 30, 2012Job Site at 60-20 Marathon Parkway Little Neck, NY 11362    Employees climbing 6-feet 4-inches above the next lower level on tubular welded frame scaffold to place cinder blocks for other employees to use.  	  WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED PURSUANT TO CFR 1903.19.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $2000.00 · Current $1000.00 Reduced
29 CFR 1926.501(b)(4)(i): Each employee on walking/working surfaces was not protected from falling through holes (including skylights) more than 6 feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around the holes:    a) On or before July 30, 2012Job Site at 60-20 Marathon Parkway Little Neck, NY 11362    Employees 9-feet above the next lower level were exposed to 12-inch holes between floor joist.    WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED PURSUANT TO CFR 1903.19.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

View SHENG SHENG CONSTRUCTION INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335515193.