OSHA Inspection: EAGLE EXTERIORS, L.L.C.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EAGLE EXTERIORS, L.L.C. in 1203 MAIN STREET, MADISONVILLE, LA 70447 (NAICS 238140). OSHA activity number 335576989.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Eagle Exteriors, L.L.C. — free Get an email when a new federal OSHA severe-injury report for Eagle Exteriors, L.L.C. is published. One employer, no account, unsubscribe in one click.
Site address
1203 MAIN STREET
City
MADISONVILLE
State
LA
ZIP
70447
Mailing
55230 PINE STREET, SLIDELL, LA 70461
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
A

6 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 3 instances 4 exposed
Issued
Nov 26, 2012
Penalty
Initial $1,700 · Current $1,700
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)    On or about August 02, 2012, the employer failed to ensure that the scaffold system was fully planked. Four employees were  on two planks where five were required applying stucco to the three story building.
Recent events (1)
  • — Z (S) $1700

1926.451 C01 II

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 26, 2012
Abate by
Dec 9, 2012
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(c)(1)(ii): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by installing guys, ties, and braces according to the manufacturer's recommendations:    On or about August 02, 2012, the employer failed to ensure that the scaffold system was adequatly tied into the building. The scaffold system that the employees were working from was approximately 31 feet in height and approximately 3 feet wide.
Recent events (1)
  • — Z (S) $2000

1926.451 E01

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 26, 2012
Abate by
Dec 9, 2012
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(e)(1):  When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.    On or about August 02, 2012, the employer failed to ensure that employees used a ladder to gain access to the working level of the scaffold system.  Employee(s) gained access to the scaffold by means of the metal framing.
Recent events (1)
  • — Z (S) $2000

1926.451 F03

Serious Gravity 1 1 instance 4 exposed
Issued
Nov 26, 2012
Abate by
Dec 9, 2012
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    On or about August 02, 2012, the employer failed to ensure that the scaffold system was inspected before each work shift. The scaffold system was on the job site for two weeks.  Employee(s) were applying stucco to the three story building from the scaffold system.
Recent events (1)
  • — Z (S) $1200

1926.451 G04 I

Serious Gravity 5 3 instances 3 exposed
Issued
Nov 26, 2012
Abate by
Dec 9, 2012
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms.      On or about August 02, 2012, the employer failed to ensure that the scaffold system was equipt with a guardrail system at the fifth level.  Employees were using the scaffold system to apply stucco to the three story building. The height of the scaffold was approximately 31 feet in height.
Recent events (1)
  • — Z (S) $2000

1926.451 H01

Serious Gravity 1 3 instances 4 exposed
Issued
Nov 26, 2012
Abate by
Dec 9, 2012
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects.     On or about August 02, 2012, the employer failed to ensure that the scaffold system was complete with toeboards. Employees were working on the fourth level which had two scaffold planks while other employees were working below them on the third level.
Recent events (1)
  • — Z (S) $1200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335576989.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.