OSHA Inspection: DELCID CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DELCID CONSTRUCTION in 2100 QUEENS CHAPEL RD NE, WASHINGTON, DC 20019 (NAICS 238350). OSHA activity number 336107784.

Watch Delcid Construction — free Get an email when a new federal OSHA severe-injury report for Delcid Construction is published. One employer, no account, unsubscribe in one click.
Establishment
DELCID CONSTRUCTION
Site address
2100 QUEENS CHAPEL RD NE
City
WASHINGTON
State
DC
ZIP
20019
Mailing
806 NORTH AMILIA ST, STERLING, VA 20164
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238350
Employees
5
Ownership type
A

7 citations on file for this inspection.

1926.21 B02

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.21(b)(2): The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.    a) Workers were observed to be using Portland cement and a scaffold improperly or without any personal protective equipment.
Recent events (1)
  • — Z (S) $2000

1926.95 A

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $1600.00
29 CFR 1926.95(a): Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact.    a) Workers were observed using Portland cement for the repair of an exterior wall with no eye or skin protection exposing them to a chemical exposure hazard.
Recent events (1)
  • — Z (S) $1600

1926.404 B01 II

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $1600.00
29 CFR 1926.404(b)(1)(ii):  Ground-fault circuit interrupters. All 120-volt, single-phase 15- and 20-ampere receptacle outlets on construction sites, which are not a part of the permanent wiring of the building or structure and which are in use by employees, shall have approved ground-fault circuit interrupters for personnel protection. Receptacles on a two-wire, single-phase portable or vehicle-mounted generator rated not more than 5kW, where the circuit conductors of the generator are insulated from the generator frame and all other grounded surfaces, need not be protected with ground-fault circuit interrupters.    a) A worker was observed, using a damaged extension cord, plugged into an outlet without a cover, with no GFCI.
Recent events (1)
  • — Z (S) $1600

1926.405 B02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(b)(2): Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.    a) A worker was observed, using a damaged extension cord, plugged into an outlet without a cover.
Recent events (1)
  • — Z (S) $0

1926.405 G02 IV

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(g)(2)(iv): Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.    a) A worker was observed, using a damaged extension cord with the sheathing pulled away at he plug end.
Recent events (1)
  • — Z (S) $0

1926.451 G04 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.    a) Two workers were observed on a scaffold which was not properly guarded by railings exposing the employees to a 14 foot fall hazard to the ground below.
Recent events (1)
  • — Z (S) $2000

1926.451 A01

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(a)(1): Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.    a) Two workers were observed on a scaffold with inadequate pins connecting the two sections together.
Recent events (1)
  • — Z (O) $0

MACY'S

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336107784.