Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: GERONIMO PAINTING COMPANY

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of GERONIMO PAINTING COMPANY in FREEPORT BRIDGE PA ROUTE 356, FREEPORT, PA 16229 (NAICS 562910). OSHA activity number 336558788.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Geronimo Painting Company — free Get an email when a new federal OSHA severe-injury report for Geronimo Painting Company is published. One employer, no account, unsubscribe in one click.
Site address
FREEPORT BRIDGE PA ROUTE 356
City
FREEPORT
State
PA
ZIP
16229
Mailing
12295 MCGEEHAN ROAD, LISBON, OH 44432
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
562910
Employees
25
Ownership type
A

4 citations on file for this inspection.

1926.62 J02 I A

Other-than-serious 1 instance 1 exposed
Issued
Oct 19, 2012
Abate by
Oct 24, 2012
Penalty
Initial $2,400 · Current $1,200 Reduced
29 CFR 1926.62(j)(2)(i)(A): The employer did not make available biological monitoring in the form of blood sampling and analysis for lead and zinc protoporphyrin levels to each employee covered under paragraph 29 CFR 1926.62 (j)(1)(ii) of this section, at least every 2 months for the first 6 months and every 6 months thereafter:    a)  Freeport Bridge Project:  On or about September 14, 2012, the employer did not make available biological monitoring in the form of blood sampling and analysis for lead and zinc protoporphyrin at least every 2 months for the first 6 months of employee exposure.  An employee designated as a blaster and grit sucker had biological monitoring on 04/11/12 and 06/21/12, but then not until 09/18/12.
Recent events (3)
  • — F (O) $1200
  • — C (S) $2400
  • — Z (S) $2400

1926.62 J02 IV B

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Oct 19, 2012
Abate by
Oct 24, 2012
Penalty
Initial $2,800 · Current $0 Reduced
29 CFR 1926.62(j)(2)(iv)(B):     The employer did not notify each employee whose blood lead level exceeded 40 micrograms per deciliter that the standard requires temporary medical removal with Medical Removal Protection benefits when an employee's blood lead level exceeded the numerical criterion for medical removal under 29 CFR 1926.62(k)(1)(i):      a)  Freeport Bridge Project:  On or about October 3, 2012, the employer did not notify each employee whose blood lead level exceeded 40 micrograms per deciliter that the standard requires temporary medical removal with Medical Removal Protection benefits.
Recent events (3)
  • — F (S) $0
  • — C (S) $2800
  • — Z (S) $2800

1926.62 J03 I A

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Oct 19, 2012
Abate by
Oct 24, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.62(j)(3)(i)(A): The employer did not make available medical examinations and consultations to each employee covered under 29 CFR 1926.62(j)(1)(ii) at least annually for each employee for whom a blood sampling test conducted at any time during the preceding 12 months indicated a blood lead level at or above 40 micrograms per deciliter:      a)  Freeport Bridge Project:  On or about October 3, 2012, the employer did not make available medical examinations and consultations to three employees at least annually for whom a blood sampling test conducted indicated a blood lead level at or above 40 micrograms per deciliter.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.106 D

Deleted Serious Gravity 5 1 instance 17 exposed
Issued
Oct 19, 2012
Abate by
Oct 24, 2012
Penalty
Initial $2,400 · Current $0 Reduced
29 CFR 1926.106(d): A lifesaving skiff was not immediately available at locations where employees were working over or adjacent to water:      a)  Freeport Bridge Project:  On or about September 14, 2012, a lifesaving skiff was not immediately available where employees were working on the Freeport Bridge over the Allegheny River.
Recent events (3)
  • — F (S) $0
  • — C (S) $2400
  • — Z (S) $2400

View Geronimo Painting Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336558788.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.