Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PROFFER WHOLESALE

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PROFFER WHOLESALE in 920 5TH ST., PARK HILLS, MO 63601 (NAICS 424480). OSHA activity number 336645585.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Proffer Wholesale — free Get an email when a new federal OSHA severe-injury report for Proffer Wholesale is published. One employer, no account, unsubscribe in one click.
Establishment
PROFFER WHOLESALE
Site address
920 5TH ST.
City
PARK HILLS
State
MO
ZIP
63601
Mailing
P.O. BOX 625, PARK HILLS, MO 63601
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
424480
Employees
175
Ownership type
A

12 citations on file for this inspection.

1910.178 L01 I

Serious Gravity 1 1 instance 50 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $2,295 · Current $1,607 Reduced
29 CFR 1910.178(l)(1)(i):     The employer did not ensure that each powered industrial truck operator was competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):    a. Motorized pallet jack users were not trained according to the requirements of the standard and documented, including "classroom" type training, demonstration, and evaluation; serious injuries have occurred.  (Note: a training program was established for forklift operators.)    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $1606.5
  • — Z (S) $2295

1910.212 A03 II

Serious Gravity 1 1 instance 4 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $2,295 · Current $1,607 Reduced
29 CFR 1910.212(a)(3)(ii):     Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):    a. The baler safety interlock was not functioning to prevent an employee from being able to raise the sliding gate or to operate the baler with the gate raised.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $1606.5
  • — Z (S) $2295

1910.303 B02

Serious Gravity 1 2 instances 14 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $2,295 · Current $1,607 Reduced
29 CFR 1910.303(b)(2):     Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:    a. A relocatable power tap (power strip) was used in the corn room for industrial purposes; and the equipment was plugged into an extension cord prohibited by its listed use.    b. The emergency stop to the baler was not tightly fitted.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $1606.5
  • — Z (S) $2295

1910.303 B07 I

Serious Gravity 1 1 instance 5 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(7)(i):     Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment:    a. The circuit breaker panel box cover at the north end of the packing room was not secured to the box.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B07 IV

Serious Gravity 1 1 instance 4 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(7)(iv):     There were damaged parts that could adversely affect safe operation or mechanical strength of the equipment, such as parts that were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating:    a. Plastic conduit to the main electrical panel on the first floor in the bagging area, was broken at the panel box.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.304 A02

Serious Gravity 1 1 instance 2 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.304(a)(2):     Grounded conductors were attached to terminals or leads so as to reverse designated polarity:    a. In the packing room at the green machine, 110 V electrical outlets were used with reverse polarity.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.304 G05

Serious Gravity 1 1 instance 10 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.304(g)(5):     The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:    a. Open ground in electrical circuits existed, such as, but not limited to, in the corn room where an extension cord was plugged into an outlet on the corn machine, used to power a scale; outlet testing indicated an open ground in the equipment.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.304 G06 I

Serious Gravity 1 1 instance 2 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.304(g)(6)(i):     Metal cable trays, metal raceways, and metal enclosures for conductors were not grounded:    a. At the first floor pallet pad, conduit to a light switch, where that conduit was acting as the ground to the circuit, was separated at two connections, with conductors exposed.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 B02 I

Serious Gravity 1 1 instance 1 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.305(b)(2)(i):     Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose:    a. A pull box next to the electrical panel at the north end of the packing house was uncovered.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G02 III

Serious Gravity 1 1 instance 2 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(2)(iii):     Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws:    a. In the packing house, at the green machine, insulation to a 110 V electrical cord and plug was pulled loose from the plug; the cord powered a conveyor.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C04 I

Other-than-serious 1 instance 4 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(4)(i):     Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:    a. There was no written lockout procedure, including machine specific procedures, as required by 1910.147(c)(4)(ii)(A) through (D), such as, but not limited to, for the bagging machine, that was powered by 208 V electrical and pneumatic energy on the gates.    Abatement documentation is required for this violation.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.147 C07 I B

Other-than-serious 1 instance 8 exposed
Issued
Oct 17, 2012
Abate by
Dec 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(i)(B):     Affected employees were not instructed in the purpose and use of the energy control procedure:    a. Where lockout was performed by authorized employees, affected employees had not received training on the purpose and use of lockout (training is required to be documented according to the requirements of the standard).    Abatement documentation is required for this violation.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336645585.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.