OSHA Inspection: JRC DESIGN BUILD, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JRC DESIGN BUILD, INC. in 1126 DUNTON, ARLINGTON HEIGHTS, IL 60005 (NAICS 238170). OSHA activity number 336652797.

Watch JRC Design Build, INC. — free Get an email when a new federal OSHA severe-injury report for JRC Design Build, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1126 DUNTON
City
ARLINGTON HEIGHTS
State
IL
ZIP
60005
Mailing
1275 DAVIS, ARLINGTON HEIGHTS, IL 60005
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
5
Ownership type
A

6 citations on file for this inspection.

1926.451 C02

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $800.00 Reduced
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:    a) Scaffolding provided for employee use at an elevation of approximately 16 feet was not built on base plates, mud sills or other adequate firm foundation.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $800
  • — Z (S) $2000

1926.451 E01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1120.00 Reduced
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms were the platforms were more than 2 feet (0.6 m) above or below a point of access.    a) Employees were not provided with safe access to a ladder jack scaffolding platform being used during siding work at an elevation of approximately 14'6".    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1120
  • — Z (S) $2800

1926.451 F15

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $0.00 Reduced
29 CFR 1926.451(f)(15): Ladders were used on scaffolds to increase the working level height of employees:    a) An aluminum extension ladder was used to increase the working height of scaffolding provided for employee use at the site.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2800

1926.451 G01 I

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $0.00 Reduced
29 CFR 1926.451(g)(1)(i): Each employee on a boatswain's chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold, was not protected by a personal fall arrest system:    a) Employees were exposed to the hazard of falling approximately 14'6" while working from ladder jack scaffolding without the benefit of fall protection.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2800

1926.451 F03

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $800.00 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    a) The employer did not have a competent person inspect scaffolding and scaffolding components before the work shift at the site.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $800
  • — Z (S) $2000

1926.416 E01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used:    a) Worn and frayed electrical cords were used to supply electrical power to a portable Skilsaw.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0