OSHA Inspection: JRC DESIGN BUILD, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JRC DESIGN BUILD, INC. in 391 ARDMORE RD., DES PLAINES, IL 60016 (NAICS 238160). OSHA activity number 336765581.

Watch JRC Design Build, INC. — free Get an email when a new federal OSHA severe-injury report for JRC Design Build, INC. is published. One employer, no account, unsubscribe in one click.
Site address
391 ARDMORE RD.
City
DES PLAINES
State
IL
ZIP
60016
Mailing
1275 DAVIS, ARLINGTON HEIGHTS, IL 60005
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
12
Ownership type
A

5 citations on file for this inspection.

1926.300 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $520.00 Reduced
29 CFR 1926.300(b)(1):  Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use:    a)  Employees were using unguarded grinder.      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $520
  • — Z (S) $1600

1926.416 A01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1120.00 Reduced
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means:    a)  Employees were not protected against accidental contact with energized overhead power lines during framing and carpentry work of the new addition to the house.  The overhead power lines consisted of secondary lines having a voltage rating of 120/240 volts.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1120
  • — Z (S) $2800

1926.501 B13

Serious Gravity 10 1 instance 2 exposed
Issued
Penalty
Initial $2800.00 · Current $1120.00 Reduced
29 CFR 1926.501(b)(13):  Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems, nor  did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502:  	  a)  Employees engaged in roofing activity were not protected from fall hazards while working at an elevation of approximately 19 feet above the ground.     No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $1120
  • — Z (S) $2800

1926.503 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $0.00 Reduced
29 CFR 1926.503(a)(1):  The employer did not provide a training program for each employee who might be exposed to fall hazards:    a)  Employer did not provide training to each employee in order to recognize hazards associated with working at an elevation and to understand procedures to control or minimize those hazards.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $2000

1926.1053 B04

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $520.00 Reduced
29 CFR 1926.1053(b)(4):  Ladder(s) were used for purposes other than the purpose for which they were designed:    a)  Employees were exposed to fall hazards while using an a-frame ladder which was not unfolded.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $520
  • — Z (S) $1600

View JRC DESIGN BUILD, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336765581.