MILWAUKEE, WI —
OSHA Inspection: B & M CONTRACTORS LLC
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of B & M CONTRACTORS LLC in 820 N. PLANKINTON AVENUE, MILWAUKEE, WI 53203 (NAICS 236220). OSHA activity number 336668413.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- B & M CONTRACTORS LLC
- Site address
- 820 N. PLANKINTON AVENUE
- City
- MILWAUKEE
- State
- WI
- ZIP
- 53203
- Mailing
- 4057 N. 60TH STREET, MILWAUKEE, WI 53216
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 5
- Ownership type
- A
Citations
10 citations on file for this inspection.
1926.1101 D02
- Issued
- Dec 26, 2012
- Abate by
- Jan 2, 2013
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.1101(d)(2): Asbestos hazards at a multi-employer work site were not abated by the contractor who created or controlled the source of asbestos contamination: a) The company performed class III asbestos demolition and renovation work of the bathroom area on the multi-employer worksite on the 4th floor 820 N. Plankinton Avenue, Milwaukee, WI 53203. This work included demolition, dry sweeping and removal of debris materials that contained asbestos inside of plastic sheeting rather than a containment under negative pressure with breaches in the plastic to cause potential exposure to people working both inside and outside the work area.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1926.1101 E01
- Issued
- Dec 26, 2012
- Abate by
- Jan 2, 2013
- Penalty
- Initial $2,800 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1101(e)(1): Regulated areas did not comply with the requirements 29 CFR 1926.1101(e)(2) through (e)(5): a) The company performing class III asbestos work as part of the demolition/renovation of the 4th floor bathroom area had breaches in plastic sheeting to enclose and contain the work operation. The company did not label or mark the area in any manner to identify the asbestos hazards, ensure respirators were used in the work area and did not limit access to prevent asbestos exposure.
Recent events (2)
- — I (S) $0
- — Z (S) $2800
1926.1101 G03 III
- Issued
- Dec 26, 2012
- Abate by
- Jan 2, 2013
- Penalty
- Initial $2,800 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1101(g)(3)(iii): Dust and debris containing asbestos containing material and presumed asbestos containing material were dry swept, shoveled or removed by other dry clean-up methods: a) The company used dry sweeping and shoveling of debris containing asbestos to clean up the demolition and renovation project conducted on the 4th floor located at 820 N. Plankinton Avenue, Milwaukee, Wisconsin 53203.
Recent events (2)
- — I (S) $0
- — Z (S) $2800
1926.1101 E06
- Issued
- Dec 26, 2012
- Abate by
- Jan 2, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.1101(e)(6): The employer did not ensure that all asbestos work performed within regulated areas was supervised by a competent person, as defined in paragraph (b) of this section: a) The class III asbestos work being performed by the company during demolition and renovation, on the 4th floor at 820 N. Plankinton Avenue, Milwaukee, Wisconsin 53203, was not supervised by a competent person with documented training for performing asbestos work.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.1101 F02 I
- Issued
- Dec 26, 2012
- Abate by
- Jan 2, 2013
- Penalty
- Initial $2,800 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1101(f)(2)(i): Each employer who has a workplace or work operation covered by this standard did not ensure that a "competent person" conducted an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace: a) The company did not have a person competent with asbestos onsite. The company did not perform any exposure assessment or monitoring at the worksite, located on the 4th floor at 820 N. Plankinton Avenue, Milwaukee, Wisconsin 53203, to determine the possible employee asbestos exposure expected during the class III demolition and renovation work performed.
Recent events (2)
- — I (S) $0
- — Z (S) $2800
1926.404 B01 I
- Issued
- Dec 26, 2012
- Abate by
- Jan 2, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites a) The company had not implemented an assured equipment grounding conductor program or ensured electrical extension cords in use were protected by a ground fault circuit interrupter for the 4th floor demolition/rehabilitation construction project at 820 North Plankinton Avenue Milwaukee, WI 53203.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 E01
- Issued
- Dec 26, 2012
- Abate by
- Jan 23, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59) a) The company did not have a written hazard communication program that included how the material safety data sheets, labeling on containers or training of employees on the chemicals used such as caulk, drywall and construction dust would be implemented.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 G01
- Issued
- Dec 26, 2012
- Abate by
- Jan 31, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(1): The employer did not have a material safety data sheet for each hazardous chemical which they used: (Construction Reference: 1926.59) a) The company did not obtain or maintain any of the material safety data sheets for chemicals and materials employees used or were exposed to on the demolition construction worksite such as caulk, gypsum, paints and wood dust.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 H01
- Issued
- Dec 26, 2012
- Abate by
- Feb 13, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59) a) Employees had not been provided any information or training regarding implementation of a hazard communication program or the hazards of chemicals used on the demolition construction site such as caulk, gypsum, paints and wood dust.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.136 A
- Issued
- Dec 26, 2012
- Abate by
- Jan 2, 2013
- Penalty
- Initial $1,600 · Current $0 Reduced
General-duty citation text
29 CFR 1910.136(a): The employer did not ensure that each affected employee uses protective footwear when working in areas where there is a danger of foot injuries due to falling or rolling objects, or objects piercing the sole, and where such employee's feet are exposed to electrical hazards: a) The company did not require employees to use protective foorwear during the demolition and debris removal work on the 4th floor at 820 N. Plankinton Avenue Milwaukee, Wisconsin 53203. Using tennis shoes where nails could pierce the shoe and/or debris could cause foot injuries.
Recent events (2)
- — I (O) $0
- — Z (S) $1600
More inspections in this industry (NAICS 236220)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336668413.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.