OSHA Inspection: RALEIGH HILL

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RALEIGH HILL in 5109 HIGHWAY 78, STONE MOUNTAIN, GA 30083 (NAICS 238140). OSHA activity number 336823398.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Raleigh Hill — free Get an email when a new federal OSHA severe-injury report for Raleigh Hill is published. One employer, no account, unsubscribe in one click.
Establishment
RALEIGH HILL
Site address
5109 HIGHWAY 78
City
STONE MOUNTAIN
State
GA
ZIP
30083
Mailing
900 BURNING BUSH DRIVE, LOGANVILLE, GA 30052
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
8
Ownership type
A

7 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 2 instances 5 exposed
Issued
Nov 8, 2012
Abate by
Nov 15, 2012
Penalty
Initial $2,000 · Current $600 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports .    On or about 10/09/2012, 5109 Highway 78, Stone Mountain, GA:   a.)  Employees were exposed to a struck-by hazard from material stacked on the H-frame scaffold, the working level was not fully planked.    b.)  Where the scaffold planks were abutted to create a longer platform, a single plank was used and it was resting on another plank, not an upright.
Recent events (2)
  • — I (S) $600
  • — Z (S) $2000

1926.451 C02

Serious Gravity 5 4 instances 5 exposed
Issued
Nov 8, 2012
Abate by
Nov 15, 2012
Penalty
Initial $2,400 · Current $600 Reduced
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:    On or about 10/09/2012, 5109 Highway 78, Stone Mountain, GA: The employees were exposed to a scaffold collapse when the legs of an H-frame scaffold did not rest on a firm foundation.
Recent events (2)
  • — I (S) $600
  • — Z (S) $2400

1926.454 B

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 8, 2012
Abate by
Nov 21, 2012
Penalty
Initial $2,400 · Current $600 Reduced
29 CFR 1926.454(b):     The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question.    On or about 10/09/2012, 5109 Highway 78, Stone Mountain, GA: Employees working on an H-frame scaffold were not trained to recognize the hazards associated with scaffolding erection including.  Deficiencies observed include but are not limited to the following, scaffold posts and legs did not rest on base plates or mud sills; working level was not fully planked; planking used to make the working platform longer, did not rest on the supports.
Recent events (2)
  • — I (S) $600
  • — Z (S) $2400

1910.1200 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Nov 8, 2012
Abate by
Nov 21, 2012
Penalty
Initial $1,600 · Current $600 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    On or about 10/09/2012, 5109 Highway 78, Stone Mountain, GA: Where employees were exposed to the hazards associated with Quikrete and sand, the employer did not develop or maintain at the workplace a copy of their written hazard communication program.
Recent events (2)
  • — I (S) $600
  • — Z (S) $1600

1910.1200 H01

Serious Gravity 1 1 instance 1 exposed
Issued
Nov 8, 2012
Abate by
Nov 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1):     Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)    On or about 10/09/2012, 5109 Highway 78, Stone Mountain, GA: The employee mixing mortar mix was not aware of the hazards associated with working with dry cement mix.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Nov 8, 2012
Abate by
Nov 15, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(1):  Employers did not have a safety data sheet in the workplace for each hazardous chemical which they use.    On or about 10/09/2012, 5109 Highway 78, Stone Mountain, GA: Material Safety Data Sheets for the Quikrete Mortar mix were no available on the job site.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 C02 I

Other-than-serious 1 instance 1 exposed
Issued
Nov 8, 2012
Abate by
Nov 21, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.134(c)(2)(i): Respirator users were not provided with the information contained in Appendix D to 29 CFR 1910.134 when the employer determined that any voluntary respirator use was permissible:    On or about 10/09/2012, 5109 Highway 78, Stone Mountain, GA: Respirator users were not provided with Appendix "D".
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336823398.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.