OSHA Inspection: QUILLIAN POWELL CONSTRUCTION CO., INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of QUILLIAN POWELL CONSTRUCTION CO., INC in 1189 DEEPSTEP ROAD, SANDERSVILLE, GA 31082 (NAICS 236220). OSHA activity number 336845599.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Quillian Powell Construction CO., INC — free Get an email when a new federal OSHA severe-injury report for Quillian Powell Construction CO., INC is published. One employer, no account, unsubscribe in one click.
Site address
1189 DEEPSTEP ROAD
City
SANDERSVILLE
State
GA
ZIP
31082
Mailing
308 TUCKER ROAD, VALDOSTA, GA 31601
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
11
Ownership type
A

3 citations on file for this inspection.

1926.501 B04 III

Serious Gravity 5 4 instances 2 exposed
Issued
Nov 8, 2012
Abate by
Dec 6, 2012
Penalty
Initial $1,360 · Current $816 Reduced
29 CFR 1926.501(b)(4)(iii): Each employee on a walking/working surface was not protected from objects falling through holes (including skylights) by covers:    On or about 10/12/12 at Sandersville, GA:  On the second floor there were two floor openings with a diameter of 12 inches and two holes that were 12"x12" that were not covered exposing employees working on the first floor to struck-by hazards while installing drain lines.
Recent events (2)
  • — I (S) $816
  • — Z (S) $1360

1926.502 B01

Serious Gravity 5 2 instances 3 exposed
Issued
Nov 8, 2012
Penalty
Initial $1,360 · Current $816 Reduced
29 CFR 1926.502(b)(1): The top edge height of the top rails, or equivalent guardrail system members, was not 42 inches (1.1 m) plus or minus 3 inches (8 cm) above the walking/working level:    On or about 10/12/12 at Sandersville, GA:  Employees were exposed to fall hazards while working at a construction site. The employer failed to ensure that top rails of guardrail system were maintained in such a manner as to protect employees from fall hazards:    a. West End:  The top rail of a guard rail system was measured at 21 inches above the ground.  The employer failed to maintain a wire rope guard rail system so that the top rail was measured at a height of 42 inches (plus or minus 3 inches).    b. East End: The top rail of a guard rail system was measured at 30 inches above the ground.  The employer failed to maintain a wire rope guard rail system so that the top rail was measured at a height of 42 inches (plus or minus 3 inches).
Recent events (2)
  • — I (S) $816
  • — Z (S) $1360

1926.502 B02

Serious Gravity 1 3 instances 3 exposed
Issued
Nov 8, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.502(b)(2): Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members shall be installed between the top edge of the guardrail system and the walking/working surface when there is no wall or parapet wall at least 21 inches (53 cm) high.  On or about 10/12/12 at Sandersville, GA:  Employees were exposed to fall hazards while working at a construction site. The employer failed to ensure that mid rails of guardrail system were maintained in such a manner as to protect employees from fall hazards:  a. West End:  The mid rail of a wire rope guarrdrail system was measured at 4 inches above the ground.  The employer failed to maintain the wire rope guard rail system so that the mid rail was measured at a height of 21 inches or half the distance to the top rail.  b. East End: The mid rail of a wire rope guard rail system was measured at 4 inches above the ground.  The employer failed to maintain a wire rope guard rail system so that the mid rail was measured at a height of 21 inches or half the distance to the top rail.  c. Window Frames:  Window frames (3) were installed without a standard midrail.  The employer failed to ensure that the window framer install adequate midrails prior to the date when the glass is installed into the frames.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Quillian Powell Construction CO., INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336845599.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.