OSHA Inspection: ARMANDO MARTINEZ MENDEZ

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ARMANDO MARTINEZ MENDEZ in 1709 MIFFLIN STREET, PHILADELPHIA, PA 19145 (NAICS 238140). OSHA activity number 336955588.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Armando Martinez Mendez — free Get an email when a new federal OSHA severe-injury report for Armando Martinez Mendez is published. One employer, no account, unsubscribe in one click.
Site address
1709 MIFFLIN STREET
City
PHILADELPHIA
State
PA
ZIP
19145
Mailing
1439 TASKER STREET, PHILADELPHIA, PA 19149
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
2
Ownership type
A

4 citations on file for this inspection.

1926.451 G01 VII

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 17, 2013
Abate by
Apr 23, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(g)(1)(vii):   For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  a) Jobsite -1709 Mifflin Street - Employees working on the tubular welded frame scaffold performing preparation to apply stucco and were exposed to fall hazards of approximately 13 feet without the use of a guardrail system or personal fall arrest system.  Employees were working on the 2nd and 4th levels of the scaffold on or about 10/17/12.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

1926.451 G04 I

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 17, 2013
Abate by
Apr 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(4)(i):   Guardrail systems were not installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.  a) Jobsite - 1709 Mifflin Street - Employees working on the tubular welded frame scaffold preparing to install stucco to the building and were exposed to fall hazards of approximately 13 feet  without the use of a guardrail system or personal fall arrest system.  Employees were working on the 2nd level and the outrigger section of the 3rd levels of the scaffold on or about 10/17/12.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.451 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 17, 2013
Abate by
Apr 23, 2013
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.451(e)(1):     When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.    a) Jobsite -1709 Mifflin Street-A ladder or other safe means of access was not provided to employees working on the tubular welded frame scaffold.  Employees were using the side frames and cross bracing to access the working levels. Observed on or about 10/17/12.       Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1600

1926.451 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 17, 2013
Abate by
Apr 23, 2013
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.451(b)(1):       Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as follows:    a) Jobsite - 1709 Mifflin Street - The working levels of the tubular welded frame scaffold were not fully planked between the front and rear uprights.  Employees were working on the 2nd & 4th levels of the scaffold.  Observed on about 10/17/12.       Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1600

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336955588.