OSHA Inspection: SCHINDLER ELEVATOR CORPORATION

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of SCHINDLER ELEVATOR CORPORATION in MOOG INC. HEADQUARTERS BUILDING SENECA & JAMISON ROADS, ELMA, NY 14059 (NAICS 238290). OSHA activity number 337011431.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Schindler Elevator Corporation — free Get an email when a new federal OSHA severe-injury report for Schindler Elevator Corporation is published. One employer, no account, unsubscribe in one click.
Site address
MOOG INC. HEADQUARTERS BUILDING SENECA & JAMISON ROADS
City
ELMA
State
NY
ZIP
14059
Mailing
80 CURTWRIGHT DRIVE, SUITE 3, WILLIAMSVILLE, NY 14221
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238290
Employees
2
Ownership type
A

2 citations on file for this inspection.

1926.404 A02

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Nov 5, 2012
Penalty
Initial $4,000 · Current $0 Reduced
29 CFR 1926.404(a)(2):     A grounded conductor was attached to a terminal or lead so as to reverse designated polarity:      a) On or about 10/16/12, at the Moog Inc. Corporate Headquarters Construction Site, Elma, NY:  Employees used fluorescent light fixtures to provide lighting in an elevator shaft. These light fixtures were connected to 120 volt-ac power via a series of extension cords, the first of which was plugged into a receptacle in a 4-receptacle outlet box mounted on a wooden 2x4 in the lower level main office area inside the building. That first cord in the series was a short black GFCI 3-Way belonging to another contractor. All 3 receptacles on this cord had "reversed polarity".    NO ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — J (S) $0
  • — C (S) $4000
  • — Z (S) $4000

1926.404 F06

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Nov 5, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.404(f)(6):     The path to ground from circuits, equipment, or enclosures was not permanent and continuous:      a) On or about 10/16/12, at the Moog Inc. Corporate Headquarters Construction Site, Elma, NY:  Employees used fluorescent light fixtures to provide lighting in an elevator shaft. These metallic light fixtures were connected to 120 volt-ac power via a series of extension cords, the first of which was plugged into a receptacle in a 4-receptacle outlet box mounted on a wooden 2x4 in the lower level main office area inside the building. That first cord in the series was a short black GFCI 3-Way belonging to another contractor. All 3 receptacles on this cord were "ungrounded" because the grounding prong was missing on its' plug.    NO ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — J (S) $0
  • — C (S) $0
  • — Z (S) $0

View Schindler Elevator Corporation's full OSHA safety record →