OSHA Inspection: REMZO MUSIC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of REMZO MUSIC in 2333 CENTRAL, EVANSTON, IL 60202 (NAICS 238350). OSHA activity number 337154587.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Remzo Music — free Get an email when a new federal OSHA severe-injury report for Remzo Music is published. One employer, no account, unsubscribe in one click.
Establishment
REMZO MUSIC
Site address
2333 CENTRAL
City
EVANSTON
State
IL
ZIP
60202
Mailing
485 ROYAL OAKS, WOOD DALE, IL 60191
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238350
Employees
3
Ownership type
A

6 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Apr 12, 2013
Abate by
May 15, 2013
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:    Remzo Music dba Scope of Work, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                     Item Number                           Abatement Date  01                                            01                                            12/19/2012  01                                            02                                            12/19/2012  01                                            03                                            12/19/2012  01                                            04a                                          01/28/2013 01                                            04b                                          01/28/2013     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $400

1926.451 B01 I

Serious Gravity 10 1 instance 3 exposed
Issued
Dec 7, 2012
Abate by
Dec 19, 2012
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(b)(1)(i):     Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary:    a)  Employer did not ensure that the working levels of the supported scaffolding system were completely planked.  Employees were exposed to falling up to approximately 25 feet to the lower levels of the site.    **In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.**
Recent events (1)
  • — Z (S) $2800

1926.451 E01

Serious Gravity 5 1 instance 3 exposed
Issued
Dec 7, 2012
Abate by
Dec 19, 2012
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(e)(1):     When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access:    a) Employees were not provided a safe means to access/egress the working levels of the supported scaffolding system.  Employees were observed climbing the cross bracing of the scaffolding system.      **In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).**
Recent events (1)
  • — Z (S) $2000

1926.451 G01

Serious Gravity 10 1 instance 3 exposed
Issued
Dec 7, 2012
Abate by
Dec 19, 2012
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(g)(1):     Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:    a)  Employer did not ensure that the employees were protected from falling from the working levels of the supported scaffolding system.  Employees were exposed to falling up to approximately 25 feet to the lower levels of the site.    **In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.**
Recent events (1)
  • — Z (S) $2800

1926.454 A

Serious Gravity 5 1 instance 3 exposed
Issued
Dec 7, 2012
Abate by
Jan 28, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.454(a):     The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    a)  The employer did not ensure that its employees were trained to recognize, control or minimize the hazards associated with the use of the tubular welded framed scaffolding system utilized at the site.    **In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).**
Recent events (1)
  • — Z (S) $2000

1926.454 B

Serious Gravity 5 1 instance 3 exposed
Issued
Dec 7, 2012
Abate by
Jan 28, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.454(b):     The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question:    a)  The employer did not ensure that its employees were trained to recognize, control or minimize the hazards associated with the erection, operation and maintenance of the scaffolding system utilized at the site.    **In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).**
Recent events (1)
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337154587.