PHILADELPHIA, PA ·
OSHA Inspection: C & C & SONS GENERAL CONTRACTING
Programmed Related inspection · Safety discipline
At a glance
On , OSHA opened a programmed Related safety inspection of C & C & SONS GENERAL CONTRACTING in 632 FITZEWATER STREET, PHILADELPHIA, PA 19146 (NAICS 236116). OSHA activity number 337192587.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- C & C & SONS GENERAL CONTRACTING
- Site address
- 632 FITZEWATER STREET
- City
- PHILADELPHIA
- State
- PA
- ZIP
- 19146
- Mailing
- 12808 GOLDI LANE, PHILADELPHIA, PA 19154
What kind of inspection was it?
- Inspection type
- Programmed Related (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236116
- Employees
- 3
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1926.451 G01 VII
- Issued
- Apr 18, 2013
- Abate by
- Apr 24, 2013
- Penalty
- Initial $2,000 · Current $1,500 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) Jobsite - 632 Fitzwater Street - Employees working on the tubular welded frame scaffold were exposed to fall hazards of up to approximately 19.5 feet without the use of a guardrail system or personal fall arrest system. Employees were working on the 3rd level of the scaffold on or about 10/24/12. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1500
- · Z (S) $2000
1926.451 E01
- Issued
- Apr 18, 2013
- Abate by
- Apr 24, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used. a) Jobsite - 632 Fitzwater Street - A ladder or other safe means of access was not provided to employees working on the tubular welded frame scaffold. Employees were using the side frames and cross bracing to access the working levels. Observed on or about 10/24/12. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.454 A
- Issued
- Apr 18, 2013
- Abate by
- Apr 24, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) Jobsite -632 Fitzwater Street - The employer did not provide each employee performing masonry operations with training to recognize the hazards and to understand the procedures to control the hazards associated with scaffolds. Observed on or about 10/24/12. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
More inspections in this industry (NAICS 236116)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 337192587.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.