OSHA Inspection: WIN-SONS POLELINE CONSTRUCTION, INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of WIN-SONS POLELINE CONSTRUCTION, INC. in 906 S. POWELL, WYNNEWOOD, OK 73098 (NAICS 237130). OSHA activity number 337207245.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Win-Sons Poleline Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Win-Sons Poleline Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
906 S. POWELL
City
WYNNEWOOD
State
OK
ZIP
73098
Mailing
6100 S. CROSSROADS BLVD, OKLAHOMA CITY, OK 73149
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237130
Employees
37
Ownership type
A

2 citations on file for this inspection.

1910.67 C02 VII

Serious Gravity 10 2 instances 2 exposed
Issued
Dec 26, 2012
Abate by
Dec 28, 2012
Penalty
Initial $4,900 · Current $2,940 Reduced
29 CFR 1910.67(c)(2)(vii):     The brakes were not set and outriggers, when used, were not positioned on pads or a solid surface:    On or about October 18, 2012, and at times prior there to, when outriggers were in use, outriggers were not positioned on pads or a solid surface.  The employees were exposed to a fall hazard.
Recent events (2)
  • — I (S) $2940
  • — Z (S) $4900

1910.67 C02 XII

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 26, 2012
Abate by
Dec 28, 2012
Penalty
Initial $3,500 · Current $2,100 Reduced
29 CFR 1910.67(c)(2)(xii):     Before moving an aerial lift for travel, the boom(s) shall be inspected to see that it is properly cradled and outriggers are in stowed position, except as provided in paragraph (c)(2)(viii) of this section.    On or about October 18, 2012, and at times prior there to, the boom on an aerial lift was not inspected to ensure it was properly cradled for transport where the boom latch was broken.  The employees were exposed to a struck by hazard.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $3500

View Win-Sons Poleline Construction, INC.'s full OSHA safety record →