TUNKHANNOCK, PA —
OSHA Inspection: BRAGA CONCRETE LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of BRAGA CONCRETE LLC in 45 EAST TIOGA STREET, TUNKHANNOCK, PA 18657 (NAICS 238140). OSHA activity number 337366215.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BRAGA CONCRETE LLC
- Site address
- 45 EAST TIOGA STREET
- City
- TUNKHANNOCK
- State
- PA
- ZIP
- 18657
- Mailing
- 303 NEW YORK AVENUE, NEWARK, NJ 07105
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 8
- Ownership type
- A
Citations
10 citations on file for this inspection.
1926.451 G01
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet (3.1 m) above a lower level was not protected from falling to that lower level. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Two (2) employees were working thirty (30) feet above a concrete sidewalk on two fabricated frame scaffolds bridged with an aluminum pickboard without any personal fall arrest systems or guardrail systems, observed on or about November 16, 2012. In accordance with 29 CFR 1903.19(c) and (d), abatement certification and documentation is required for this violation.
Recent events (1)
- — Z (S) $2800
1926.451 B01
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Two (2) employees were working thirty (30) feet above a concrete sidewalk on two fabricated frame scaffolds bridged with an aluminum pickboard. The platforms on the working levels were not fully planked or decked and were approximately sixteen (16) to twenty (20) inches wide, observed on or about November 16, 2012. In accordance with 29 CFR 1903.19(c) and (d), abatement certification and documentation is required for this violation.
Recent events (1)
- — Z (S) $2800
1926.451 C02
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not have base plates and mud sills or other adequate firm foundation. a) a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Two (2) employees were working thirty (30) feet above a concrete sidewalk on two fabricated frame scaffolds bridged with an aluminum pickboard with scaffold frames that were not placed on base plates, observed on or about November 16, 2012. In accordance with 29 CFR 1903.19(c) and (d), abatement certification and documentation is required for this violation.
Recent events (1)
- — Z (S) $0
1926.451 H01
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(h)(1): In addition to wearing hardhats each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, or guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Employees beneath the platform on the working level of the scaffold were not protected from falling objects by a hard hat, toeboards, screens or guardrail systems, debris nets, catch platforms or canopy structures, on or about November 16, 2012. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation.
Recent events (1)
- — Z (S) $0
1926.452 C02
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.452(c)(2): Frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which secure vertical members together laterally. The cross braces were of such length as will automatically square and align vertical members so that the erected scaffold is always plumb, level, and square. All brace connections were not secured. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Two (2) employees were working on scaffolds with frames not braced securely laterally and with brace connections not secured on the north sides of the West Scaffold and East Scaffold, observed on or about November 16, 2012. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation.
Recent events (1)
- — Z (S) $0
1926.451 E01
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces should not, but were being used as a means of access. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: An employee used a crossbrace approximately thirteen (13) feet above a concrete sidewalk to access and exit the West Scaffold, observed on or about November 16, 2012. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation.
Recent events (1)
- — Z (S) $2000
1926.451 F07
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities were not performed only by experienced and trained employees selected for such work by the competent person. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Two (2) scaffolds used by employees were not erected under the supervision and direction of a competent person qualified in scaffold erection, on or about November 16, 2012. In accordance with 29 CFR 1903.19(c) and (d), abatement certification and documentation is required for this violation.
Recent events (1)
- — Z (S) $2800
1926.451 F03
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Two (2) scaffolds used by employees were not inspected by a competent person before each work shift and after Hurricane Sandy, on or about November 16, 2012. In accordance with 29 CFR 1903.19(c) and (d), abatement certification and documentation is required for this violation.
Recent events (1)
- — Z (S) $0
1926.454 B
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.454(b): The employer did not provide training to each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Two (2) scaffolds were erected, operated, maintained and inspected by employees who were not provided scaffold training, on or about November 16, 2012. In accordance with 29 CFR 1903.19(c) and (d), abatement certification and documentation is required for this violation.
Recent events (1)
- — Z (S) $0
1926.100 A
- Issued
- Dec 21, 2012
- Abate by
- Dec 28, 2012
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, were not protected by protective helmets. a) Front sidewalk of Prince Hotel, Braga Concrete LLC, 45 East Tioga Street, Tunkhannock, PA: Employees without protective helmets were performing masonry work and using a winch to move tools, equipment and materials while beneath and upon scaffolds, on or about November 16, 2012. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation.
Recent events (1)
- — Z (S) $1600
More inspections in this industry (NAICS 238140)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337366215.