Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BALBO CONSTRUCTION CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BALBO CONSTRUCTION CORP. in V.I. DEPT. OF PUBLIC WORKS SUB BASE, ST THOMAS, VI 00801 (NAICS 236220). OSHA activity number 337489819.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Balbo Construction Corp. — free Get an email when a new federal OSHA severe-injury report for Balbo Construction Corp. is published. One employer, no account, unsubscribe in one click.
Site address
V.I. DEPT. OF PUBLIC WORKS SUB BASE
City
ST THOMAS
State
VI
ZIP
00801
Mailing
P.O. BOX 9435, ST THOMAS, VI 00801
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
30
Ownership type
A

5 citations on file for this inspection.

1926.403 B02

Serious Gravity 5 1 instance 5 exposed
Issued
Jan 15, 2013
Abate by
Feb 11, 2013
Penalty
Initial $3,500 · Current $1,750 Reduced
29 CFR 1926.403(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:       a)  On or about 11/14/2012, Balbo Construction Corp., V.I. Dept. of Public Works (DPW), Subbase, St Thomas VI - Building entrance area: Employees were exposed to electrical hazards while using a extension cord connected to a job made electrical outlet receptacle.    NOTE:  Documentation of abatement must be submitted for this citation item as required by 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $1750
  • — Z (S) $3500

1926.404 F06

Serious Gravity 5 1 instance 5 exposed
Issued
Jan 15, 2013
Abate by
Feb 11, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous    a.   On or about 11/14/2012, Balbo Construction Corp., V.I. Dept. of Public Works (DPW), Sub base, St Thomas VI - Building entrance area:  Employees were using electrical power tools connected to a job made electrical extension cord lacking its ground prong.      Note:  Certification and documentation of abatement must be submitted for this citation item as required by 29 CFR 1903.19(c) and (d), respectively.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 15, 2013
Abate by
Feb 11, 2013
Penalty
Initial $3,500 · Current $1,750 Reduced
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:      a.    On or about 11/14/2012, Balbo Construction Corp., V.I. Dept. of Public Works, Sub base, St Thomas VI  Scaffold area:  Employees were observed working over a two bed tubular frame scaffold at height of 14 ft. above the ground level, without a conventional fall protection system in place.      NOTE:  Certification and documentation of abatement must be submitted for this citation item as required by 29. CFR 1903.19(c) and (d), respectively.
Recent events (2)
  • — I (S) $1750
  • — Z (S) $3500

1926.404 B01 II

Repeat Gravity 5 1 instance 5 exposed
Issued
Jan 15, 2013
Abate by
Feb 11, 2013
Penalty
Initial $7,000 · Current $3,500 Reduced
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection    a. On or about 11/14/2012, Balbo Construction Corp., V.I. Dept. of Public Works (DPW) Building, Sub base, St Thomas VI -  entrance area:  Employees were using electrical power tools connected to an electrical receptacle lacking a ground fault circuit interrupter (GFCI).        NOTE 1: 	Balbo Construction Corp, was previously cited for a violation of this Occupational Safety and Health standard or its equivalent standard 29 CFR 1926.404(b)(1)(ii) which was contained in the OSHA Inspection Number # 313532541, Citation 1, Item number 1, issued on 07/06/2010, with respect to a work place located at St. Thomas Regional Library & Records Center, St. Thomas VI  00801.     NOTE 2:  Certification and documentation of abatement must be submitted for this citation item as required by 29. CFR 1903.19(c) and (d), respectively.
Recent events (2)
  • — I (R) $3500
  • — Z (R) $7000

1926.451 B01

Repeat Gravity 5 1 instance 1 exposed
Issued
Jan 15, 2013
Abate by
Feb 11, 2013
Penalty
Initial $7,000 · Current $3,500 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):    a.    On or about 11/14/2012, Balbo Construction Corp., V.I. Dept. of Public Works, Sub base, St Thomas VI - Scaffold area:  Employees were observed working over a five bed scaffold in which its working platforms areas were not fully planked.        NOTE 1: 	Balbo Construction Corp, was previously cited for a violation of this Occupational Safety and Health standard or its equivalent standard 29 CFR 1926.451(b)(1) which was contained in the OSHA Inspection Number # 313532541, Citation 1, Item number 5 (a), issued on 07/06/2010, with respect to a work place located at St. Thomas Regional Library & Records Center, St. Thomas VI  00801.     NOTE 2:  Certification and documentation of abatement must be submitted for this citation item as required by 29. CFR 1903.19(c) and (d), respectively.
Recent events (2)
  • — I (R) $3500
  • — Z (R) $7000

View Balbo Construction Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337489819.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.