OSHA Inspection: UNIVERSAL DEVELOPMENT CO. LLC

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of UNIVERSAL DEVELOPMENT CO. LLC in 4004 EDMUNDS ST NW, WASHINGTON, DC 20008 (NAICS 238140). OSHA activity number 337529812.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Universal Development CO. LLC — free Get an email when a new federal OSHA severe-injury report for Universal Development CO. LLC is published. One employer, no account, unsubscribe in one click.
Site address
4004 EDMUNDS ST NW
City
WASHINGTON
State
DC
ZIP
20008
Mailing
5203 LEESBURG PIKE #607, FALLS CHURCH, VA 22041
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
10
Ownership type
A

8 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 28, 2013
Abate by
Mar 26, 2013
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.102(a)(1):  Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:    a) On or about October 24, 2012; rear of building; employee was operating a masonry saw without eye protection.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1600

1926.405 B02

Serious Gravity 1 5 instances 5 exposed
Issued
Feb 28, 2013
Abate by
Mar 26, 2013
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.405(b)(2):  In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy:    a) On or about October 24, 2012; throughout interior floors; employees were using unguarded energized outlets either plugged in directly or by portable extension cords to power electrical such as but not limited to drills, saws and portable lighting.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

1926.403 B02

Serious Gravity 5 2 instances 5 exposed
Issued
Feb 28, 2013
Abate by
Mar 26, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.403(b)(2):  Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification:    a) On or about October 24, 2012; second floor; employees were using a power strip/tap to provide power to portable equipment either directly or through portable extension cords. The power strips/taps are not designed for outdoor or construction sites. The use of the equipment in this environment exposes the employees to an electrical shock.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.403 I02 I

Serious Gravity 5 1 instance 5 exposed
Issued
Feb 28, 2013
Abate by
Mar 20, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.403(i)(2)(i):  Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraphs (A) through (D) of this paragraph:    a) On or about October 24, 2012; second floor; employees were exposed to an energized panelbox that was not properly guarded.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Feb 28, 2013
Abate by
Mar 26, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(b)(1):  Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):    a) On or about October 24, 2012; rear of building, employees were observed working on a scaffold system that was not fully planked; the height from the work platform to ground level was 30 feet.	    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2800

1926.451 C01 II

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 28, 2013
Abate by
Mar 26, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(c)(1)(ii):  Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by installing guys, ties, and braces according to the manufacturer's reccomendations:    a) On or about October 24, 2012; rear of building; employees were working on a 6-7 tier scaffold system that was not properly secured to prevent it from falling/tipping.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

1926.451 E01

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 28, 2013
Abate by
Mar 26, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(e)(1):  When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access:    a) On or about October 24, 2012; rear of building; employees were exposed to a fall of approximately 30-40 feet when accessing the working platform by climbing the scaffold frame.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

1926.451 G04 III

Serious Gravity 5 4 instances 3 exposed
Issued
Feb 28, 2013
Abate by
Mar 26, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(g)(4)(iii):  When midrails, screens, mesh, intermediate vertical members, solid panels, or equivalent structural members are used, they were not installed between the top edge of the guardrail system and the scaffold platform.    a) On October 24, 2012; rear of building; employees were working on a scaffold system in which the working platform was not equipped with mid-rails to protect the employees from falling 30-40 feet to ground level.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337529812.