OSHA Inspection: PEDRO BUNAY DBA BUNAY BROTHER'S CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PEDRO BUNAY DBA BUNAY BROTHER'S CONSTRUCTION, INC. in 5724 N. PULASKI ROAD, CHICAGO, IL 60646 (NAICS 238160). OSHA activity number 337624415.

Watch Pedro Bunay DBA Bunay Brother'S Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Pedro Bunay DBA Bunay Brother'S Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
5724 N. PULASKI ROAD
City
CHICAGO
State
IL
ZIP
60646
Mailing
3301 N. KEYSTONE, CHICAGO, IL 60641
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
A

3 citations on file for this inspection.

1926.501 B10

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1680.00 Reduced
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system:    a) Employees were not protected from the hazard of falling approximately 19 feet from the roof edge while engaged in roofing activities without the use of fall protection or a combination of warning lines and safety monitoring.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1926.502 F01 III

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $1200.00 Reduced
29 CFR 1926.502(f)(1)(iii): Points of access, materials handling areas, storage areas, and hoisting areas were not connected to the work area by an access path formed by two warning lines:    a) Warning lines were not used to create access paths connecting the work area to the point of access at the edge of the roof.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1926.503 B01

Other-than-serious 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer:    a) The employer did not prepare written certification records related to employee fall protection training.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337624415.