Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ARMY CORPS OF ENGINEERS, BONNEVILLE RESIDENT OFFICE

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of ARMY CORPS OF ENGINEERS, BONNEVILLE RESIDENT OFFICE in THE DALLES DAM, THE DALLES, OR 97058 (NAICS 928110). OSHA activity number 337730816.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Army Corps of Engineers, Bonneville Resident Office — free Get an email when a new federal OSHA severe-injury report for Army Corps of Engineers, Bonneville Resident Office is published. One employer, no account, unsubscribe in one click.
Site address
THE DALLES DAM
City
THE DALLES
State
OR
ZIP
97058
Mailing
P.O. BOX 70, CASCADE LOCKS, OR 97014
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
928110
Employees
4
Ownership type
D

1 citation on file for this inspection.

1910.305 G02 II

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 22, 2013
Abate by
Apr 17, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(2)(ii):     Hard-service cord and junior hard-service cord No. 14 and larger were repaired by splicing, which did not retain the insulation, outer sheath properties, and usage characteristics of the cord that was spliced: Note:  Hard service flexible cords No. 12 or larger may be spliced if the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced.    The Dalles Dam Field Trailer-    (a) The 115 volt 10 AWG temporary power cord was spliced and did not retain the usage characteristics of spliced flexible cord, creating a serious electrical shock or burn hazard.
Recent events (1)
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337730816.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.