Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RAMIREZ BUILDING SERVICES, INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RAMIREZ BUILDING SERVICES, INC in 1480 HARVARD ST, NW, WASHINGTON, DC 20010 (NAICS 238350). OSHA activity number 337943211.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Ramirez Building Services, INC — free Get an email when a new federal OSHA severe-injury report for Ramirez Building Services, INC is published. One employer, no account, unsubscribe in one click.
Site address
1480 HARVARD ST, NW
City
WASHINGTON
State
DC
ZIP
20010
Mailing
1428 HAMPSHIRE COURT, #5, SILVER SPRING, MD 20903
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238350
Employees
2
Ownership type
A

5 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 26, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is not decked as fully as possible:     a) West Side of the Building - A carpenter was observed on a tubular welded frame scaffold that was not fully decked exposing him to a 33 foot fall hazard onto the concrete sidewalk below, on or about December 18, 2012.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $2800

1926.451 E01

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 26, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.      a) West Side of the Building - A carpenter was observed on a tubular welded frame scaffold that was not equipped with a ladder for egress exposing him to a 33 foot fall hazard onto the concrete sidewalk below, on or about December 18, 2012.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 G03

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 26, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(g)(3): In addition to meeting the requirements of 1926.502(d), personal fall arrest systems used on scaffolds were not attached by lanyard to a vertical lifeline, horizontal lifeline, or scaffold structural member. Vertical lifelines were not used when overhead components, such as overhead protection or additional platform levels, are part of a single-point or two-point adjustable suspension scaffold:    a) West Side of the Building - A carpenter was observed with a nylon rope instead of a lanyard, tied to the D-ring of the full body harness as part of his personal fall arrest system exposing him to a 33 foot fall hazard onto the concrete sidewalk below, on or about December 18, 2012.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $2800

1926.1051 A

Serious Gravity 1 1 instance 1 exposed
Issued
Feb 26, 2013
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided:    a) 3rd Floor, front Room, West Window - A carpenter was observed using a window for accessing an exterior scaffold where the window sill measured 29 inches above the floor exposing him to a slip and fall hazard, on or about December 18, 2012.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

1926.1052 C01 I

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 26, 2013
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail:    a) Between 1st & 2nd floors and 2nd & 3rd Floors - A foreman and a carpenter were observed using the stairs between various floors was not equipped with a standard handrail exposing him to a 20 foot hazard, on or about December 18, 2012.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

View Ramirez Building Services, INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337943211.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.