OSHA Inspection: GENE'S CONSTRUCTION

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of GENE'S CONSTRUCTION in 3334 TEJON STREET, DENVER, CO 80211 (NAICS 237110). OSHA activity number 338002421.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Gene'S Construction — free Get an email when a new federal OSHA severe-injury report for Gene'S Construction is published. One employer, no account, unsubscribe in one click.
Establishment
GENE'S CONSTRUCTION
Site address
3334 TEJON STREET
City
DENVER
State
CO
ZIP
80211
Mailing
6800 HURON STREET, DENVER, CO 80221
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
1
Ownership type
A

2 citations on file for this inspection.

1926.651 C02

Serious Gravity 5 3 instances 1 exposed
Issued
Feb 13, 2013
Abate by
Mar 6, 2013
Penalty
Initial $1,530 · Current $918 Reduced
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees:    (a) Genes Construction @ 3334 Tejon Street, Denver, CO. On or before December 12, 2012, the exposing employer did not ensure that a ladder, ramp or other suitable safe of egress was provided for the employee who was working in the vertically-sided trench, which measured depth was 43 and 5 long.  The only means of egress was climbing up the side walls of the trench. This condition exposed employees to a crushing hazard by trench cave-in.
Recent events (2)
  • — I (S) $918
  • — Z (S) $1530

1926.651 J02

Serious Gravity 5 3 instances 1 exposed
Issued
Feb 13, 2013
Abate by
Mar 6, 2013
Penalty
Initial $1,530 · Current $918 Reduced
29 CFR 1926.651(j)(2):  Protection was not provided by placing and keeping excavated other materials or equipment at least 2 feet (.61m) from the edge of excavation, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary:    (a) Genes Construction @ 3334 Tejon Street, Denver, CO. On or before December 12, 2012, the exposing employer did not ensure that the spoil pile was not kept @ least 2 feet from the edge of the vertically-walled trench, which measured depth was 4 3 and 5 ft. in length.  This condition exposed employees to the hazard of the spoil pile falling into the trench while conducting work inside the trench.
Recent events (2)
  • — I (S) $918
  • — Z (S) $1530

View Gene'S Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338002421.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.