Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PILGRIM'S PRIDE CORPORATION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of PILGRIM'S PRIDE CORPORATION in 19740 US 90 WEST, LIVE OAK, FL 32064 (NAICS 311615). OSHA activity number 338015019.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pilgrim'S Pride Corporation — free Get an email when a new federal OSHA severe-injury report for Pilgrim'S Pride Corporation is published. One employer, no account, unsubscribe in one click.
Site address
19740 US 90 WEST
City
LIVE OAK
State
FL
ZIP
32064
Mailing
P.O. BOX 1000, LIVE OAK, FL 32064
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
311615
Employees
1700
Ownership type
A

2 citations on file for this inspection.

1910.119 J04 I

Deleted Serious Gravity 10 1 instance 1300 exposed
Issued
Apr 26, 2013
Abate by
May 22, 2013
Penalty
Initial $7,000 · Current $0 Reduced
29 CFR 1910.119(j)(4)(i):  The employer did not perform inspections and tests on process equipment:  a.  On or about December 19, 2012, the employer had not conducted tests on the Manning Ammonia Detectors in engine room 5 at least semi -annually using calibration gas as required by the operations manual.
Recent events (2)
  • — I (S) $0
  • — Z (S) $7000

1910.119 L01

Other-than-serious 1 instance 1300 exposed
Issued
Apr 26, 2013
Abate by
May 15, 2013
Penalty
Initial $7,000 · Current $4,350 Reduced
29 CFR 1910.119(l)(1):  The employer did not implement procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process:    a.  On or about December 19, 2012, the employer had not implemented the Management of Change process to install a new ammonia sensor system in Engine Room 5, exposing employee to potential overexposure to ammonia.
Recent events (2)
  • — I (O) $4350
  • — Z (S) $7000

View Pilgrim'S Pride Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338015019.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.