OSHA Inspection: SCHMID TOOL & ENGINEERING CORPORATION

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of SCHMID TOOL & ENGINEERING CORPORATION in 930 NORTH VILLA AVENUE, VILLA PARK, IL 60181 (NAICS 332710). OSHA activity number 338182637.

Watch Schmid Tool & Engineering Corporation — free Get an email when a new federal OSHA severe-injury report for Schmid Tool & Engineering Corporation is published. One employer, no account, unsubscribe in one click.
Site address
930 NORTH VILLA AVENUE
City
VILLA PARK
State
IL
ZIP
60181
Mailing
930 NORTH VILLA AVENUE, VILLA PARK, IL 60181
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332710
Employees
120
Ownership type
A

11 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 5 1 instance 10 exposed
Issued
Abate by
Penalty
Initial $4500.00 · Current $2025.00 Reduced
29 CFR 1910.147(c)(4)(i):     Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:     Schmid Tool & Engineering Corporation did not develop and implement machine specific Lockout/Tagout procedures.     Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $2025
  • — Z (S) $4500

1910.147 C06 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.147(c)(6)(i):   The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed.   Schmid Tool & Engineering Corporation did not conduct an annual inspection of their lockout program.   Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.215 A02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3600.00 · Current $1620.00 Reduced
29 CFR 1910.215(a)(2):     Abrasive wheel(s) used on grinding machinery were not provided with safety guard(s) which covered the spindle end, nut, flange projections.     The Bovar Schultz, #69, surface grinder, was not equipped with a safety guard which covered the spindle end, nut and flange projections.      Abatement certification is required for this item in accordance with 29 CFR 1903.19(c)
Recent events (2)
  • — I (S) $1620
  • — Z (S) $3600

1910.217 C02 I A

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4500.00 · Current $2025.00 Reduced
29 CFR 1910.217(c)(2)(i)(a):     Point of operation guard(s) on mechanical power press(es) did not prevent entry of hands or fingers into the point of operation by reaching through, over, under or around the guard(s).     The Bliss Punch Press, #38, was not equipped with a front guard, and the side guard had an opening of approximately 7 x 9 inches, which did not prevent operators from placing their hands and fingers into the point of operation.     Abatement documentation for this item is required in accordance with the 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $2025
  • — Z (S) $4500

1910.217 C03 IV B

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4500.00 · Current $2025.00 Reduced
29 CFR 1910.217(c)(3)(iv)(b): Attachments for pullout device(s) used on mechanical power press(es) were not adjusted to prevent the operator from reaching into the point of operation or from withdrawing his hands from the point of operation before the die:    The pullout devices used on #36 Bliss Mechanical Power Press, were not adjusted as required by the manufacturer's manual.  Fingertips were adjusted up to the edge of the die, within 1/2 inch, rather than the three inches in front of the die/pinch point as required.    Abatement certification is required for this item in accordance with 29 CFR 1903.19(c).
Recent events (2)
  • — I (S) $2025
  • — Z (S) $4500

1910.217 C03 IV D

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4500.00 · Current $2025.00 Reduced
29 CFR 1910.217(c)(3)(iv)(d): Pullout device(s) on mechanical power press(es) were not visually inspected and checked for proper adjustment at the start of each operator shift, following a new die setup, and when operators were changed. Records of inspections were not maintained:     The pull out device on #36 Bliss Mechanical Power Press was not inspected and checked for proper adjustment and records were not maintained.    Abatement certification is required for this item in accordance with 29 CFR 1903.19(c).
Recent events (2)
  • — I (S) $2025
  • — Z (S) $4500

1910.217 E01 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.217(e)(1)(i):   A program of periodic and regular inspections of mechanical power press(es) was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment.  Schmid Tool & Engineering Corporation did not establish a program of periodic and regular inspections of their mechanical power presses.   Abatement documentation is required for this item in accordance with 28 CFR 1903.19(d).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.217 D09 II

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $3600.00 · Current $1620.00 Reduced
29 CFR 1910.217(d)(9)(ii): Spring loaded turnover bars were not provided for mechanical power press(es) designed to accept such turnover bars:    A spring loaded turnover bar was not provided nor used for setup of the Bliss #38, 60 ton, mechanical power press.    Abatement certification is required for this item in accordance with 29 CFR 1903.19(c).
Recent events (2)
  • — I (S) $1620
  • — Z (S) $3600

1910.219 D01

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2700.00 · Current $1215.00 Reduced
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o):    The belt and pulley on the Comet-XT Drill Press was not guarded as required.    Abatement certification is required for this item in accordance with 29 CFR 1903.19(c).
Recent events (2)
  • — I (S) $1215
  • — Z (S) $2700

1910.219 E01 I

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.219(e)(1)(i): Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt:  The belt and pulley on the Comet-XT Drill Press was not guarded as required.  Abatement certification is required for this item in accordance with 29 CFR 1903.19(c).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 B01 II

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2700.00 · Current $1215.00 Reduced
29 CFR 1910.305(b)(1)(ii):     Unused openings in boxes, cabinets, or fittings were not effectively closed.    On the Clausing Drill Press, Serial #532140, the receptacle box had a knockout missing, exposing live electrical wires.    Abatement certification is required for this item in accordance with 29 CFR 1903.19(c).
Recent events (2)
  • — I (S) $1215
  • — Z (S) $2700

View SCHMID TOOL & ENGINEERING CORPORATION's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338182637.